OpenRFPCloses Dec 9, 2026, 5:00 PM CT

WFE Solenoid and Corrector Magnet Package for Proton Beam Steering

Department of Energy — FERMILAB - DOE CONTRACTORBatavia, Illinois#389116swk

Fermilab seeks a contractor to design and fabricate two specialized magnet packages for proton beam steering and focusing. Each package includes a solenoid coil and two dipole corrector coils (horizontal and vertical), with strict technical requirements for magnetic field strength, cooling, materials, and construction. Deliverables include complete assemblies, drawings, reports, and documentation. Questions must be submitted by 5:00 PM Central, November 30, 2026.

Open Original Bid Source Pro

Overview

Due
Dec 9, 2026, 5:00 PM CT
Time stated in bid documents
Dec 9, 2026, 5:00 PM Central Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
email, electronic portal
Contract term
36 weeks after receipt of order
Documents analyzed
4 published · 2 analyzed

Scope of work

  • Ensure field homogeneity within ±1% in a 20 mm good field region
  • Provide magnetic measurement test plans and reports for each magnet
  • Include swivel hoist rings and alignment fiducials for installation and alignment
  • Submit a completed RFP page, SARC form, and PROC-FRM-466 form with the proposal

Steps to Bid

  1. 1

    Submit all required forms: RFP page, SARC (Subcontractor Annual Reps & Certs), and PROC-FRM-466 Proposal Certifications.

  2. 2

    Submit questions to Spencer Keske by 5:00 PM Central, November 30, 2026. by Nov 30, 2026, 5:00 PM

  3. 3

    Ensure all documents are submitted by 5:00 PM Central, December 9, 2026. by Dec 9, 2026, 5:00 PM

What you'll need

Submission

Email, Electronic portal

NAICS

332999

How to submit

Submit all documents electronically via the Official linkPro portal or by email to [email available with Pro]. Ensure the proposal includes the completed RFP page, SARC form, PROC-FRM-466 form, and all technical and pricing information. Proposals must be received by 5:00 PM Central, December 9, 2026.

In person/mail: Fermilab, Receiving Warehouse 2, Kirk Rd & Wilson Street, Batavia, IL 60510, United States

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The scope includes full engineering, manufacturing, testing, and documentation. Deliverables include: 2 complete magnet assemblies, final drawings, production schedule, material certifications, final design report, QC plans/reports, magnetic test plans/reports, and nameplates. The magnets must meet strict technical specifications: solenoid field strength of 0.3 T²m at peak current, maximum current 300 A, power dissipation <6.5 kW, field homogeneity ±1% in a 20 mm good field region, and dipole field integral of 0.5 mT·m. All components must be fabricated from specified materials (1006/1008 low carbon steel, #12 square heavy ML coated copper wire), with water cooling via 3/4” FNPT Swagelok fittings. The magnets must be vacuum-impregnated with epoxy, painted NAL Blue, and include swivel hoist rings, alignment fiducials, and a unique serial number. The Subcontractor must submit a preliminary design, infrastructure capabilities, and a Gantt chart.

Key dates

Questions due
Nov 30, 2026, 5:00 PM Central Time
Bids due
Dec 9, 2026, 5:00 PM CT

Documents

  • WFE_Solenoid_SOW_389116swk.pdf15 pages
  • F00484505---DWG1.pdf1 pages
  • RFP_389116swk.pdf3 pages
  • F10009710_-_PDF_1.pdf1 pages

See all documents · Download with Pro

Contact

Agency contact for this bidName, email & phone — included with ProPro

More from this agency

Similar open bids

Closing this week nearby