Installation of pedestrian hybrid beacon, pedestrian countdown signals, new sidewalk and pavement markings on Squirrel Road at intersection of Cross Creek Parkway, Auburn Hills, Oakland County
Michigan Department of Transportation — MDOTMichigan#63000-222063
This is a construction project to install a pedestrian hybrid beacon, pedestrian countdown signals, new sidewalk, and pavement markings at the intersection of Squirrel Road and Cross Creek Parkway in Auburn Hills, Oakland County. Bids are due December 4, 2026, at 10:30 AM local time at 425 W. Ottawa St., Lansing, MI 48933. The completion date is September 3, 2027. The project is advertised on November 13, 2026.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 10:30 AM Eastern Time
- Bid bond
- 10%
- Submission
- electronic portal
- Contract term
- 3 years + two additional one-year renewal terms
- Documents analyzed
- 1
Steps to Bid
- 1
Submit any questions to the MDOT contact listed in the advertisement by the deadline specified in the notice. by Nov 27, 2026, 10:30 AM
- 2
Attend the mandatory pre-bid meeting on October 15, 2026, at 10:00 AM at the MDOT Grand Rapids TSC Office, 2660 Leonard Street NE, Grand Rapids, MI 49525. was Oct 15, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Prepare and submit the bid proposal, including the bid bond, by the due date and time. by Dec 4, 2026, 10:30 AM
What you'll need
Submission
Electronic portal
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
The net classification required is 369 L or Comb/Jt. 369 Ea, J. The completion date is September 3, 2027.
Key dates
- Questions due
- Nov 27, 2026, 10:30 AM Eastern Time
- Pre-bid meeting
- Oct 15, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 4, 2026
Documents
- ads.pdf49 pages
More from this agency
- Road Reconstruction, Drainage, and Bridge Work on I-475 and Approaches in Flint and Burton, Genesee County, MI — closes Nov 20, 2026
- Construction of Noise Barrier Wall, Concrete Barrier, Steel Sheet Piling, Drilled Shafts, Curb and Gutter, Drainage,… — closes Nov 20, 2026
- 0.87 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, storm sewer, signing, and… — closes Dec 4, 2026
- 0.24 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, storm sewer,… — closes Dec 4, 2026
- Pedestrian crossing improvements, rectangular rapid flashing beacons, concrete curb and gutter, sidewalk ramps, and… — closes Dec 4, 2026
Similar open bids
- 0.39 mi of hot mix asphalt crushing, shaping, and resurfacing, culverts, guardrail, signing, and pavement markings on… — Michigan Department of Transportation
- 9.88 mi of chip seal, single and fog seal, and overband crack seal joints on M-60 from west of Corey Lake Road to west… — Michigan Department of Transportation
- 8.34 mi of overband crack fill, chip seal, fog seal, and pavement markings on US-131 from Boon Road northerly to Old… — Michigan Department of Transportation
- Bridge Reconstruction Including 3-Sided Aluminum Culvert on CIP Concrete Footing and Approach Work on Arnold Road Over… — Michigan Department of Transportation
Closing this week nearby
- Otsego District Public Library: E-Rate FY2027 Category 1 & Category 2 - Internet Access and Data Transmission Service;… — closes Nov 17, 2026
- Mott Children's Von Voigtlander Women's Hospitals – FY26 CW CES Two Resus Bay Updates — closes Nov 17, 2026
- Proof of Delivery (POD) Software for HomeMed Pharmacy — closes Nov 17, 2026
- Cedar Springs Public Schools: E-Rate FY2027 Category 2 - Wireless Access Points, Controllers, Switches, Racks, and… — closes Nov 17, 2026
- Fraser Public School District: E-Rate FY2027 Category 2 - Cabling; Racks — closes Nov 17, 2026