Pedestrian crossing improvements, rectangular rapid flashing beacons, concrete curb and gutter, sidewalk ramps, and pavement markings in Kalamazoo, Kalamazoo County
Michigan Department of Transportation — MDOTMichigan#39000-220121
This is a construction project for pedestrian crossing improvements, including rectangular rapid flashing beacons, concrete curb and gutter, sidewalk ramps, and pavement markings on various routes in Kalamazoo, Kalamazoo County. The project is managed by the Michigan Department of Transportation (MDOT) as a Local Agency project. The bid submission deadline is 10:30 AM, Local Time, December 4, 2026, at 425 W. Ottawa St., Lansing, MI 48933. The project completion date is August 27, 2027. The estimated number of plan pages is 51. Bidders may examine the proposal and plans online at <[link available with Pro]>.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 10:30 AM Eastern Time
- Submission
- mail, hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 1
Scope of work
- Install rectangular rapid flashing beacons at designated pedestrian crossings
- Construct concrete curb and gutter along designated routes
- Build sidewalk ramps at intersections and crosswalks
- Apply pavement markings for pedestrian crossings and traffic guidance
- Complete all work by August 27, 2027
Steps to Bid
- 1
Register with MDOT e-Prop system to access proposal and plans.
- 2
Review the full project description, plans, and specifications available at <Official linkPro>.
- 3
Submit questions to the designated contact by the deadline specified in the notice.
- 4
Prepare and submit the bid package by 10:30 AM, Local Time, December 4, 2026, at 425 W. Ottawa St., Lansing, MI 48933. by Dec 4, 2026, 10:30 AM
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
Net Classification: 806 L. Required SBP Participation: 0.00%. Date advertised: 11/13/2026. Electronic bidding is not required.
Key dates
- Bids due
- Dec 4, 2026
Documents
- ads.pdf49 pages
More from this agency
- Installation of New Landscaping at Reconstructed Bay City Rest Area, Bay County · closes Dec 4, 2026
- Bridge Rehabilitation Including Partial Slab Replacement, Full Depth Patching, Substructure Patching, and Approach… · closes Dec 4, 2026
- Hot Mix Asphalt Reconstruction, Drainage, Shared-Use Path, Concrete Curb and Sidewalk, Box Culvert Replacement,… · closes Dec 4, 2026
- 2.77 mi of Hot Mix Asphalt Shared-Use Path and Mid-Block Pedestrian Crossing with Concrete Sidewalk Ramps Upgrades in… · closes Dec 4, 2026
- Concrete Roadway Reconstruction, Water Main, Drainage, Guardrail, Traffic Signals, Signing, Bridge Rehabilitation, and… · closes Dec 4, 2026
Similar bids in Michigan
- Roadway Reconstruction and Bridge Replacement on M-49 in Camden, Hillsdale County, Michigan · closes Dec 4, 2026
- Reconstruction of Big Rapids Rest Area, US-131SB South of M-20, Mecosta County · closes Dec 4, 2026
- Traffic signal modernization and concrete sidewalk ramp upgrades in Fowler, Grand Ledge, Eaton Rapids, and… · closes Dec 4, 2026
- 0.31 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, storm sewer, traffic signal,… · closes Dec 4, 2026
- 0.87 mi of hot mix asphalt reconstruction, concrete curb, gutter, sidewalk and ramps, storm sewer, signing, and… · closes Dec 4, 2026
Closing soon in Michigan
- Renovations and Construction at Harbor Beach Community Schools · closes Nov 30, 2026
- Audio Visual Web Conferencing Services — Request for Proposals · closes Dec 1, 2026
- selection of an Energy Services Company (ESCO) · closes Dec 2, 2026
- Environmental Health Apps Maintenance & Support RFP · closes Dec 4, 2026
- 2023 Bond - Phase 6 HS Fire Alarm/Gym Renovations · closes Dec 4, 2026