OpenRFPCloses Dec 17, 2026, 2:00 PM CT

Lehman Rd Pump Station Improvements

City of Kyle — Water UtilitiesKyle, Hays, Texas#RFP-2026-076

The City of Kyle is soliciting proposals for the construction of a new ground storage tank, pump station, facility building, and supporting infrastructure to increase water storage and pumping capacity in the southeastern service area, particularly Pressure Plane 1 (PP1). The project includes advanced instrumentation and control systems, on-site emergency power generation, and infrastructure to improve system reliability, pressure management, fire protection, and operational flexibility. The upgraded facility will support projected water demands through 2038 and enable future expansion. The solicitation is issued by the Water Utilities department.

On PublicBidSearch: the original bid posting for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 17, 2026, 2:00 PM CT
Time stated in bid documents
Dec 17, 2026, 2:00 PM Central Time
Submission
email, portal

Steps to Bid

  1. 1

    Submit questions to the designated contact by the questions deadline (if any).

  2. 2

    Submit a complete proposal by the due date and time. by Dec 17, 2026, 2:00 PM

What you'll need

Submission

Email, Portal

How to submit

Proposals must be submitted via the City of Kyle's procurement portal at Official linkPro. Submissions may also be sent by email to the designated contact if specified. Ensure all required forms and documentation are included in the submission package.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The improvements will include advanced instrumentation and control systems, on-site emergency power generation, and associated facilities necessary to support reliable and efficient water distribution operations. The project is intended to address increasing water demands within the City's southeastern service area, particularly Pressure Plane 1 (PP1), while improving overall system reliability, operational flexibility, pressure management, and fire protection capabilities. The improvements will also support the consolidation of pumping operations and provide additional system redundancy to maintain dependable water service. Upon completion, the upgraded Lehman facility will serve as a critical component of the City's water distribution system, providing the pumping and storage capacity needed to accommodate projected demands through 2038. The project will also establish infrastructure capable of supporting future expansion as the City continues to grow.

Key dates

Bids due
Dec 17, 2026, 2:00 PM CT

More from this agency

Similar bids near Kyle

Closing soon near Kyle