OpenConstructionCloses Dec 8, 2026

Monarch Playground Upgrades and Replacement

City of San RamonSan Ramon, Contra Costa, California

The City of San Ramon is seeking proposals for the Monarch Park Playground Upgrades and Replacement Project. The project involves the design and construction of new playground facilities with a Monarch butterfly theme. Key requirements include installation of temporary fencing, removal of existing equipment and surfacing, installation of new playground equipment and EWF safety surfacing, and a CPSI safety audit. The maximum project price is $200,000.00. The contract term is from award through December 31, 2027, with a one-year renewal option. Bidders must hold a California Class “A”, “C-27”, or “C-61” contractor's license and a CPSI certification. Performance and Payment Bonds, each for 100% of the contract price, are required.

Open Original Bid Source Pro

Overview

Due
Dec 8, 2026
Time stated in bid documents
Dec 8, 2026, 2:00 PM Pacific Time
Bid bond
Required
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
December 31, 2027 + one (1) successive one-year term
Documents analyzed
1

Scope of work

  • Install 6' temporary chain link construction fencing and warning signs.
  • Remove and dispose of existing play equipment and EWF safety surfacing.
  • Design and install new playground equipment with a Monarch butterfly theme for ages 2-5 and 5-12.
  • Install a two-bay, arch-style swing set with various swing types.
  • Install new Engineered Wood Fiber (EWF) safety surfacing.
  • Obtain a safety audit and certification from a Certified Playground Safety Inspector (CPSI).

Steps to Bid

  1. 1

    Submit written inquiries or objections. by Nov 17, 2026, 5:00 PM

    Questions, requests for clarification, or objections must be submitted in writing to Matt Ramirez at [email available with Pro].

  2. 2

    Submit completed Proposals. by Dec 8, 2026, 2:00 PM

    Proposals must be sealed in an envelope and submitted to the City Clerk’s Office at 7000 Bolinger Canyon Road, San Ramon, CA 94583.

What you'll need

Contract duration

December 31, 2027

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project is located at 8502 N Monarch Road, San Ramon, CA 94582. Proposers must commence Work within ten (10) working days of the Notice to Proceed. Proposers and Subcontractors must obtain a City of San Ramon Business License. The project is subject to prevailing wage requirements.

Key dates

Questions due
Nov 17, 2026, 5:00 PM Pacific Time
Bids due
Dec 8, 2026
Expected award
Feb 9, 2027

Documents

  • MONARCH_PLAYGROUND_UPGRADES_AND_REPLACEMENT_CIP_955423_FINAL_-_SIGNED.pdf83 pages

See all documents · Download with Pro

Contact

Agency contact for this bidName, email & phone — included with ProPro

More from this agency

Similar open bids

Closing this week nearby