OpenIFBCloses Dec 22, 2026

New 24-Inch Reclaimed Water Main Between Hudson Rapid Rate Infiltration Basins (RRIB) and Shady Hills Wastewater Treatment Facility (WWTF)

Pasco CountyFlorida#RSQ-KM-27-030

Pasco County is soliciting proposals for engineering services to design, permit, and support construction of a new 24-inch reclaimed water main connecting the Hudson RRIB and Shady Hills WWTF. The scope includes design, permitting, potential real estate acquisition, and construction support. Responses must be submitted via the BonfireHub portal.

On PublicBidSearch: the original bid posting for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 22, 2026
Time stated in bid documents
Dec 22, 2026, 1:30 PM Eastern Time
Submission
electronic portal

Scope of work

  • Potential real estate acquisition for pipeline right-of-way
  • Engineering services for a water infrastructure project in Pasco County, FL
  • Connection between Hudson RRIB and Shady Hills WWTF

Steps to Bid

  1. 1

    Review the solicitation documents available on the BonfireHub portal at Official linkPro. was Nov 18, 2026, 12:30 PM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Submit questions by December 8, 2026, at 1:30 PM ET via the BonfireHub portal. by Dec 8, 2026, 1:30 PM

  3. 3

    Prepare and submit a complete proposal by December 22, 2026, at 1:30 PM ET through the BonfireHub portal. by Dec 22, 2026, 1:30 PM

What you'll need

Submission

Electronic portal

How to submit

Submit proposal via the BonfireHub portal at Official linkPro. All documents must be uploaded in the required format as specified in the Response Format (F. RESPONSE FORMAT.pdf).

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Pasco County Board of County Commissioners invites qualified proposers to submit a proposal for comprehensive engineering services, including design, permitting, potential real estate acquisition, and construction support, for the construction of a new 24-inch reclaimed water main between the Hudson Rapid Rate Infiltration Basins (RRIB) and the Shady Hills Wastewater Treatment Facility (WWTF), as defined in the Statement of Work.

Key dates

Questions due
Dec 8, 2026, 1:30 PM Eastern Time
Bids due
Dec 22, 2026

More from this agency

Similar bids in Florida

Closing soon in Florida