East Collin County MUD No. 1 Wastewater Treatment Facility – Phase 1, 0.15 MGD MBR WWTP Installation
East Collin County Municipal Utility District No. 1Texas
East Collin County MUD No. 1 is soliciting sealed bids for the construction of the non-equipment portion of a 0.15 MGD MBR wastewater treatment plant. Bids must be submitted by 2:00 p.m. local time on December 17, 2026, to Pape-Dawson, 6105 Tennyson Parkway, Suite 210, Plano, Texas 75024, or via [link available with Pro]. The work includes site preparation, grading, drainage, piping, concrete structures, electrical and control systems, and associated site work. The project is located in Plano, Texas.
On PublicBidSearch: the newspaper notice for this bid.
Overview
- Due
- Dec 17, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 17, 2026, 2:00 PM Central Time
- Submission
- mail, electronic portal
Scope of work
- Drainage and stormwater management
- Influent and effluent piping
- Concrete structures and foundations
Steps to Bid
- 1
Review the full notice and any attached documents (if available) to understand the scope, requirements, and submission instructions.
- 2
Submit a sealed bid to Pape-Dawson, 6105 Tennyson Parkway, Suite 210, Plano, Texas 75024, or via Official linkPro, by 2:00 p.m. local time on Thursday, December 17, 2026. by Dec 17, 2026, 2:00 PM
- 3
Attend the public bid opening via Microsoft Teams (Meeting ID: 291 9555587446048, Passcode: JG6jr3jB) on December 17, 2026, at 2:00 p.m. local time. by Dec 17, 2026, 2:00 PM
What you'll need
Submission
Mail, Electronic portal
How to submit
Bids must be sealed and submitted to Pape-Dawson, 6105 Tennyson Parkway, Suite 210, Plano, Texas 75024, or via Official linkPro. Bids will be publicly opened and read via Microsoft Teams at 2:00 p.m. local time on December 17, 2026.
In person/mail: Pape-Dawson, 6105 Tennyson Parkway, Suite 210, Plano, Texas 75024
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Bids will be publicly opened and read in person or via Microsoft Teams (Meeting ID: 291 9555587446048, Passcode: JG6jr3jB). The project is Bid No. 2: East Collin County MUD No. 1 Waste Water Treatment Facility – Phase 1, 0.15 MGD MBR WWTP Installation. The scope of work includes furnishing and installing all labor, materials, equipment, and incidentals required to construct the non-equipment portion of the East Collin County MUD No. 1 Wastewater Treatment Plant No. 1, Phase 1, 0.15 MGD MBR WWTP.
Key dates
- Bids due
- Dec 17, 2026, 2:00 PM CT
Similar bids in Texas
- Wastewater Treatment Plant No. 1 - Phase 1 (0.15 MGD) Site Work to Serve Fort Bend County Municipal Utility District… · closes Dec 9, 2026
- Brazoria County Municipal Utility District No. 57 Phase Three Detention Basin Excavation, Spoil Placement, and Outfall… · closes Nov 30, 2026
- Phase Three Detention Basin Excavation, Spoil Placement, and Outfall to Serve Ellwood Phase Three · closes Dec 3, 2026
- Village Grove Phase 3-3 Subdivision Improvements · closes Dec 11, 2026
- Mass Grading and Detention for Section 1 of Walnut Trail (On Behalf of Walnut Creek MUD) · closes Dec 21, 2026
Closing soon in Texas
- Supply, Rental, and Transportation of Chlorine and Sulfur Dioxide for Multiple TDCJ Facilities · closes Nov 30, 2026
- Volunteer Management System · closes Dec 2, 2026
- Hybrid Battery Disposal · closes Dec 2, 2026
- ITB - Bridge Construction Labor · closes Dec 3, 2026
- Request for Qualifications — Cameron County Drainage District No. 5 · closes Dec 4, 2026