Village Grove Phase 3-3 Subdivision Improvements
Dripping Springs Municipal Utility District No. 1Texas
This is a construction solicitation for Village Grove Phase 3-3 Subdivision Improvements, including right-of-way work, underground utilities (water, wastewater, stormwater), earthwork, grading, drainage, and removal of stockpiled debris. A mandatory pre-bid conference on November 17, 2026, at 2:00 PM via Microsoft Teams is required for eligibility. No bid may be withdrawn for 75 days after opening.
On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 11, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 11, 2026, 10:00 AM Central Time
- Submission
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Construct right-of-way and utility infrastructure for 67 new lots
- Remove stockpiled brush, trees, debris, and rock from adjacent future phase
- Attend mandatory pre-bid conference to qualify for bidding
Steps to Bid
- 1
Register and download the contract documents from Official linkPro, Project ID: 25000480.001A, beginning November 8, 2026. was Nov 8, 2026
This date has passed — confirm eligibility with the agency before bidding.
- 2
Attend the mandatory pre-bid conference via Microsoft Teams on Tuesday, November 17, 2026, at 2:00 PM. was Nov 17, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Submission
NAICS
237130
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The solicitation is for the construction of Village Grove Phase 3-3 Subdivision Improvements, including right-of-way construction, sub-surface utility installations (water, wastewater, stormwater), earthwork and grading, drainage improvements, and related appurtenances to facilitate the development of an additional 67 lots within the Village Grove subdivision. Stockpiles of brush, trees, debris, and rock located in an adjacent future phase must be demolished and removed from the site. on behalf of Dripping Springs Municipal Utility District No. 1. Bids will be publicly opened and read aloud via Microsoft Teams at 11:00 AM on the same day. A link to the Microsoft Teams bid opening is available on [link available with Pro], Project ID: 25000480.001A. 71 W., Ste. Proposals must be plainly marked with the name and address of the submitting entity and labeled: PROPOSAL FOR VILLAGE GROVE PHASE 3-3 SUBDIVISION IMPROVEMENTS PUBLIC BID. Only prospective bidders who have attended the mandatory pre-bid conference may submit a bid. If withdrawn, the bid guaranty becomes the property of the Owner as liquidated damages.
Key dates
- Questions due
- Dec 1, 2026, 5:00 PM Central Time
- Pre-bid meeting
- Nov 17, 2026, 2:00 PM Central Time
- Bids due
- Dec 11, 2026, 10:00 AM CT
Similar bids in Texas
- Detention and Grading to Serve Tamarron Detention Phase XII · closes Dec 8, 2026
- East Collin County MUD No. 1 Wastewater Treatment Facility – Phase 1, 0.15 MGD MBR WWTP Installation · closes Dec 17, 2026
- Brazoria County Municipal Utility District No. 57 Phase Three Detention Basin Excavation, Spoil Placement, and Outfall… · closes Nov 30, 2026
- Invitation to Bid — Brazoria County Municipal Utility District No. 57: Phase Three Detention Basin Excavation, Spoil… · closes Dec 3, 2026
- BCMUD No. 57 Phase 3 Detention Basin Excavation, Spoil Placement & Outfall to Serve Ellwood Phase 3 · Brazoria County · closes Nov 30, 2026
Closing soon in Texas
- Request for Qualifications — Carbon Fiber Reinforced Polymer (CFRP) Systems for Structural Rehabilitation of Large… · closes Nov 25, 2026
- Steel Chain, 5/16 inch · closes Nov 26, 2026
- Professional Architect and/or Engineer Services for District Ag Barn Project · closes Nov 26, 2026
- Shuttle Bus Services · closes Nov 30, 2026
- Bob Hall Pier Restaurant Services Management and Operation · closes Dec 1, 2026