UAB John N. Whitaker Building - 4th Floor Demolition - Bidder Pre-Qualification
University of Alabama at BirminghamAlabama
The University of Alabama at Birmingham (UAB) is seeking to pre-qualify General Contractors for selective demolition work on the 4th floor of the John N. Whitaker Building. The scope includes approximately 32,500 sq ft of demolition of partitions, finishes, and MEP components, along with temporary sprinkler system modifications. The project is located in an occupied hospital environment, requiring strict ICRA/ILSM compliance. Bidders must demonstrate experience with similar demolition projects. Pre-qualification submittals are due by January 26, 2027, at 2:00 PM local time. Submittals can be emailed to expedite review, with hard copies and flash drives to follow within 24 hours.
On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 26, 2027, 2:00 PM CT
- Time stated in bid documents
- Jan 26, 2027, 2:00 PM Central Time
- Submission
- email, mail, hand delivery
- Required submission items
- 5 items · full checklist with Pro
Steps to Bid
- 1
Submit pre-qualification submittals. by Jan 26, 2027, 2:00 PM
Original and two (2) flash drives with duplicates of submittals required for pre-qualification approval. Email transmission copies may be sent to [email available with Pro], cc [email available with Pro], to expedite review, with hard copy and two flash drives to be delivered within 24 hours.
What you'll need
Prequalification
RequiredSubmission
Email, Mail, Hand delivery
How to submit
The original and two (2) flash drives with duplicates of submittals are required for pre-qualification approval; however, email transmission copies may be transmitted to the Project Manager at [email available with Pro] and cc'd to [email available with Pro] to expedite the review process with a hard copy of the submittal and two flash drives to be delivered within 24 hours.
In person/mail: 8th FL Daniel Building, 15 20th Street South, Birmingham, AL 35233
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 5-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Advertisement for bidder pre-qualification and notice of intent to receive bids from prequalified bidders for selective demolition of the 4th Floor of the UAB John N. Whitaker Building (approximately 32,500 sq ft). Scope includes partitions, architectural finishes, and mechanical, electrical, and plumbing system components. Temporary modifications to existing fire sprinkler system heads are also required. The project will be performed in an occupied hospital environment and requires strict adherence to Infection Control and Interim Life Safety Measures (ICRA/ILSM) due to sensitive adjacent spaces. Pre-qualification submittals will be received by UAB PM Darren Kruty on behalf of Office of the Chief Facilities Officer, UAB Medicine, University of Alabama at Birmingham, and the University of Alabama Board of Trustees at 8th FL Daniel Building, 15 20th Street South, Birmingham, AL 35233. The original and two (2) flash drives with duplicates of submittals are required for pre-qualification approval; however, email transmission copies may be transmitted to the Project Manager at [email available with Pro] and cc'd to [email available with Pro] to expedite the review process with a hard copy of the submittal and two flash drives to be delivered within 24 hours.
Key dates
- Bids due
- Jan 26, 2027, 2:00 PM CT
More from this agency
Similar bids in Alabama
- Procurement of Depot Level Repairable (DLR) Parts via Basic Ordering Agreement SPE4A1-25-G-0011 · closes Dec 30, 2026
- Disaster Debris Removal Services Contract · closes Dec 3, 2026
- Davis Cleaners Demolition and Site Restoration — City of Montgomery, Alabama (Project No. CP 26-01) · closes Dec 10, 2026
- Trammell Street Building Demolition, Project No. 26A2404 · Atmore · closes Dec 15, 2026
- Housing Inspection Scope of Services for CDBG-DR Homeownership Assistance Program · Bay Minette · closes Dec 9, 2026
Closing soon in Alabama
- RFP for 2025–2035 Statewide Historic Preservation Plan, Alabama Historical Commission · closes Nov 30, 2026
- Safety Widening, Planing, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, Guardrail Installation, and Traffic… · closes Dec 4, 2026
- Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, Traffic Signal Upgrades, and Traffic Stripe on SR… · closes Dec 4, 2026
- Micro-Milling, Resurfacing, Guardrail Installation (Steel Blockout Replacement), and Traffic Stripe on SR-59 from CR… · closes Dec 4, 2026
- Construction of Pre-Manufactured Terminal Building at Carl Folsom Airport · closes Dec 4, 2026