Hot Mix Asphalt Reconstruction with Roundabout, Storm Sewer, and Sidewalks on M-59 at Latson Road, Livingston County
Michigan Department of Transportation — MDOTMichigan#47082-210655
This is a construction project involving 0.41 miles of hot mix asphalt reconstruction on M-59 at Latson Road in Livingston County, Michigan. Scope includes a roundabout, storm sewer, culvert, concrete curb and gutter, sidewalk, shared-use path, signing, guardrail, and pavement markings. The project includes a 5-year materials and workmanship pavement warranty. The project is scheduled for completion on November 15, 2029. Bids are due December 4, 2026, at 10:30 AM local time at 425 W. Ottawa St., Lansing, MI 48933.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 10:30 AM Eastern Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 1
Steps to Bid
- 1
Attend the mandatory pre-bid meeting on Thursday, October 15, 2026, at 10:00 AM at the MDOT Grand Rapids TSC Office, 2660 Leonard Street NE, Grand Rapids, MI 49525. was Oct 15, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 2
Submit a written question to the MDOT project engineer by October 22, 2026, to ensure timely response before the bid due date. was Oct 22, 2026, 10:30 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit your bid proposal, including the bid bond, by December 4, 2026, at 10:30 AM local time, delivered to 425 W. Ottawa St., Lansing, MI 48933. by Dec 4, 2026, 10:30 AM
What you'll need
Contract duration
11/15/2029
Submission
Mail, Hand delivery
NAICS
237131, 237132
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Required SBP participation: 0.00%. Estimated pages for plans: 106. Date advertised: November 6, 2026.
Key dates
- Pre-bid meeting
- Oct 15, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 4, 2026
Documents
- ads.pdf33 pages
More from this agency
- 5.07 mi of Hot Mix Asphalt Cold Milling, Resurfacing, Shoulder Widening, Drainage Improvements, Guardrail… · closes Dec 4, 2026
- Installation of pedestrian hybrid beacon, pedestrian countdown signals, new sidewalk and pavement markings on Squirrel… · closes Dec 4, 2026
- 9.88 mi of chip seal, single and fog seal, and overband crack seal joints on M-60 from west of Corey Lake Road to west… · closes Dec 4, 2026
- 1.17 mi of Hot Mix Asphalt Resurfacing, Drainage Improvements, and Pavement Markings on South Shore Drive, Manistee… · closes Dec 4, 2026
- 0.24 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, storm sewer,… · closes Dec 4, 2026
Similar bids in Michigan
- 10.10 mi of hot mix asphalt cold milling and resurfacing, corrugations and pavement markings on I- 94 from 40th Street… · closes Dec 4, 2026
- Angling Road Elementary Site Clearing Package — Portage Public Schools · closes Nov 30, 2026
- Elmira Township Road Resurfacing · closes Dec 15, 2026
- 0.06 mi of Hot Mix Asphalt Widening, Concrete Curb, Gutter, Sidewalk, and Ramps on I-94BL at Ravenswood Road in… · closes Dec 4, 2026
- Traffic Signal Modernization on Lapeer Road, Wadhams Street, and 24th Street, St. Clair County · closes Dec 4, 2026
Closing soon in Michigan
- MDHHS DDS-226-K Business Reply Booklet Envelope · closes Dec 1, 2026
- DIFS FIS 0404 Green Insurance License Pressure Seal · closes Dec 1, 2026
- Submersible Sump Pump Procurement for City of Niles Wastewater Treatment Plant · closes Dec 2, 2026
- Employee Benefits Consulting Services · closes Dec 4, 2026
- Asbestos Abatement at Morenci Elementary School and Morenci Junior/Senior High School · closes Dec 4, 2026