Replace Flooring and Wallcoverings at St. Louis Forensic Treatment North
Missouri Office of Administration - Division of Facilities Management — St. Louis Forensic Treatment NorthSt. Louis, Missouri#M2403-01
Scope includes removal and disposal of existing wallcoverings, patching drywall, painting, and installing acoustical panels in the multipurpose gym. Work involves shifting and lifting of existing furniture/equipment. Electronic bids must be submitted to [email available with Pro] by 1:30 PM, January 7, 2027. A pre-bid meeting is required at 10:00 AM, December 14, 2026, at the project site. Contractor must comply with Missouri prevailing wage law and federal work authorization requirements.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 7, 2027, 11:59 PM CT
- Submission
- Contract term
- 160 working days from the date the Notice of Intent to Award is issued, as modified by additional days added by the Owner’s acceptance of alternates, if applica
- Documents analyzed
- 4 published · 2 analyzed
- Required submission items
- 6 items · full checklist with Pro
Scope of work
- Replace flooring and wall base in specified spaces
- Remove and dispose of existing wallcoverings
Steps to Bid
- 1
Register as a planholder by obtaining a bid set from American Document Solutions (ADS) at Official linkPro or via mail. A deposit of $100.00 is required for paper sets; electronic sets are free.
- 2
Attend the mandatory pre-bid meeting on December 14, 2026, at 10:00 AM at St. Louis Forensic Treatment Center North, Conference Room 3010, 5351 Delmar Blvd., St. Louis, MO. Access to state property requires a photo ID. by Dec 14, 2026, 10:00 AM
What you'll need
Insurance
RequiredThe Contractor shall pay not less than the specified hourly rate of wages, as set out in the wage order attached to and made part of the specifications for work under this contract, to all workers performing work under the contract, in accordance with sections 290.210 to 290.340, RSMo. The Contractor shall forfeit a penalty to the Owner of one hundred dollars per day (or portion of a day) for each worker that is paid less than the specified rates for any work done under the contract by the Contractor or by any subcontractor, in accordance with section 290.250, RSMo.
Contract duration
160 working days from the date the Notice of Intent to Award is issued, as modified by additional days added by the Owner’s acceptance of alternates, if applicable. This includes ten (10) working days for document mailing and processing.
Submission
NAICS
236220
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 6-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Refer to finish plans A111 and A112 for designated rooms. Refer to specifications 090561 for floor preparation and 096500 for resilient flooring. Refer to A-110 for wallcovering removal and acoustical panel locations. Refer to A-109 for finish schedules, 099123 Interior Painting, and 098430 Sound Absorbing Wall and Ceiling Units. Contractor responsible for labor, materials, tools/equipment, and aerial lift. Contractor may not leave tools or equipment unattended. Pre-bid meeting at 10:00 AM, December 14, 2026, at St. Louis Forensic Treatment Center North, Conference Room 3010, 5351 Delmar Blvd., St. Louis, MO. Contractor must enroll in a federal work authorization program and comply with IIRIRA and anti-discrimination against Israel laws.
Key dates
- Pre-bid meeting
- Dec 14, 2026, 10:00 AM Central Time
- Bids due
- Jan 7, 2027, 11:59 PM CT
Documents
- M2403-01_Bid_Documents.pdf19 pages
- M2403-01_IFB.pdf1 pages
- M2403-01_Drawings_Bid_11-5-26.pdf
- M2403-01_Final_specs.pdf
More from this agency
- Reclaim & Stabilize Marsh Phase 1 Campgrounds – Big Lake State Park · closes Dec 1, 2026
- Renovate CCC Restroom into Cabin at Washington State Park, Desoto, Missouri · closes Dec 3, 2026
- HVAC and Interior Renovation · closes Dec 8, 2026
- Install New HVAC · closes Dec 10, 2026
- Replace Mechanical Equipment, Multiple Assets at Fulton State Hospital · closes Jan 7, 2027
Similar bids near St. Louis
- CONTRACT - Carpets · St. Louis · closes Dec 1, 2026
- Senior Center Carpet Replacement · O'Fallon · closes Dec 9, 2026
Closing soon near St. Louis
- Disc Brake Rotor Bolt Kit 35'/40' Gillig - RFQ #708111 · St. Louis · closes Nov 30, 2026
- Hdlght Assy R/H Complete, Panel Skirt Rear Wh/Well C/S #7 35&40' (Unpainted) - RFQ #708113 · St. Louis · closes Dec 1, 2026
- Asbestos Pipe Insulation Abatement and Reinsulation · St. Louis · closes Dec 1, 2026
- Purchase of Flashlight and Dry Cell Batteries for City of St. Louis Departments · St. Louis · closes Dec 1, 2026
- Relay Dc Reverse Current Type 32 REQ 218732 · St. Louis · closes Dec 1, 2026