Replace Supply Air Units - VAV with Reheat, Michael N. Keathley State Office Building
Missouri Office of Administration - Division of Facilities Management — Michael N. Keathley State Office BuildingSt. Louis, Missouri#O2622-01
The State of Missouri is soliciting bids to replace supply air terminal units with VAV with reheat systems in the Michael N. Keathley State Office Building in St. Louis. The scope includes removal of existing units, installation of new units, and modifications to ductwork, power, and controls. The project is subject to Missouri prevailing wage laws and the Anti-Discrimination Against Israel Act. The contract must be completed within 150 working days from the Notice of Intent to Award, with liquidated damages of $700 per working day for delay. The bid deadline is 1:30 PM on January 5, 2027, submitted electronically to [email available with Pro].
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 5, 2027, 11:59 PM CT
- Submission
- Contract term
- 150 working days from the Notice of Intent to Award
- Documents analyzed
- 4 published · 2 analyzed
- Required submission items
- 7 items · full checklist with Pro
Scope of work
- Modify electrical power connections for new units
- Modify control system wiring for new units
- Submit Anti-Discrimination Against Israel Act certification
Steps to Bid
- 1
Register as a planholder by obtaining the bid documents from American Document Solutions (ADS) at 1400 Forum Blvd., Suite 7A, Columbia, MO 65203, or online at Official linkPro. A $100 deposit is required for paper sets; electronic sets are available at no cost.
- 2
Attend the pre-bid meeting on December 8, 2026, at 10:00 AM at Faith Group LLC, 3101 S. Hanley Rd., St. Louis, MO. Attendance is mandatory for all bidders. by Dec 8, 2026, 10:00 AM
- 3
Submit the bid electronically to [email available with Pro] by 1:30 PM on January 5, 2027.
What you'll need
Contract duration
150 working days from the Notice of Intent to Award
Submission
NAICS
238290, 238210
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 7-item required-submittals checklist
Cancel anytime · no card to browse
Key dates
- Pre-bid meeting
- Dec 8, 2026, 10:00 AM Central Time
- Bids due
- Jan 5, 2027, 11:59 PM CT
Documents
- O2622-01_Bid_Documents.pdf19 pages
- O2622-01_IFB.pdf1 pages
- 2026.09.25_-_Micheal_Keathley_Building_Drawings_-_Issued_for_Bid.pdf
- O2622-01_Final_specs.pdf
More from this agency
- Reclaim & Stabilize Marsh Phase 1 Campgrounds – Big Lake State Park · closes Dec 1, 2026
- Renovate CCC Restroom into Cabin at Washington State Park, Desoto, Missouri · closes Dec 3, 2026
- Replace HVAC-BAS & Air Handlers, Park Bldg.(HU-01) · closes Jan 7, 2027
- Replace Flooring and Wallcoverings at St. Louis Forensic Treatment North · closes Jan 7, 2027
- Replace Mechanical Equipment, Multiple Assets at Fulton State Hospital · closes Jan 7, 2027
Similar bids near St. Louis
- Z2DA--FY27 EHRM | 657-21-702JC EHRM Training And Administrative Space Construction - St Louis John Cochran · St. Louis · closes Dec 9, 2026
- Textile Shredder Machine for Shredding Police Uniforms · St. Louis · closes Dec 1, 2026
- Meramec Greenway Unger County Park Tail Realignment · St. Louis · closes Dec 15, 2026
- Grass Maintenance and Trash and Debris Removal Services for Vacant Lots and Buildings in St. Louis, MO · St. Louis · closes Dec 14, 2026
- 1.5, 2.0, 2.5 CY Refuse Containers · St. Louis · closes Dec 8, 2026
Closing soon near St. Louis
- Must be OEM items only and meet all Bi-State specifications. No substitutes (708125) · St. Louis · closes Nov 30, 2026
- WIOA Title I Career Services RFP · St. Louis · closes Nov 30, 2026
- Flare Fender/Wheelwell Front 35/40 ft Gillig 38 to 7501-15, Closeout Lower Front Stepwell Enclosure, Cap Hub Front… · St. Louis · closes Dec 1, 2026
- Filter Water 38 to 7300,7551-77 (Extended Filter WF2122) – OEM Match Required · St. Louis · closes Dec 2, 2026
- PreQualification For 11820-015.1 Lower And Middle RDP CSO Storage Tunnel (Broadway To RDP Tubes) · St. Louis · closes Dec 4, 2026