Request for Qualifications for Construction Manager at Risk (CMR) Services – GBCMHC Sprinkler System and Related Renovations
DAS Construction ServicesConnecticut#BI-MH-139-CMR-2
The State of Connecticut, through DAS Construction Services, is seeking a Construction Manager at Risk (CMR) for the renovation of the sprinkler system and related upgrades at the Greater Bridgeport Community Mental Health Center (GBCMHC), an 8-story, 144,000 sq. ft. mental health facility in Bridgeport, CT. The project must comply with NFPA 99, NFPA 101, ASHRAE 170, and Joint Commission standards. Work will be phased and coordinated to minimize disruption during ongoing occupancy. All qualified vendors may respond. A QBS Submittal Booklet (max 10 MB) must be submitted electronically by December 3, 2026, at 3:00 PM ET. No line items are specified.
Overview
- Due
- Dec 3, 2026
- Time stated in bid documents
- Dec 3, 2026, 3:00 PM Eastern Time
- Submission
- electronic portal
- Documents analyzed
- 1
Scope of work
- Coordinate phased construction during building occupancy
- Submit QBS Submittal Booklet (max 10 MB) via electronic portal
Steps to Bid
- 1
Register on the Proactis Cloud portal (Official linkPro) if not already registered.
- 2
Review the full solicitation documents, including the QBS Submittal Booklet Instructions, 90% CD Phase Narrative Report, Drawings, and Project Manual.
- 3
Prepare and submit a QBS Submittal Booklet (maximum 10 MB) via the 'Attach Documents' tab on the portal. by Dec 3, 2026, 3:00 PM
What you'll need
Submission
Electronic portal
NAICS
236220, 236221
How to submit
Upload one (1) QBS Submittal Booklet (file size SHALL NOT exceed 10 MB) under the 'Attach Documents' tab prior to the end date and time of the solicitation. If the 'Attach Documents' tab is not visible, ensure all solicitation documents have been opened and accepted on the 'Overview' tab.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The facility serves approximately 100 in-patients and provides outpatient services, food services, administrative offices, conference rooms, and a pharmacy. The project must comply with the Joint Commission’s adoption of NFPA Code 101® 2012 (Life Safety Code), NFPA 99® 2012 (Health Care Facilities Code), ASHRAE 170, and JC EC 02.05.01.
Key dates
- Bids due
- Dec 3, 2026
Documents
- BI-MH-139-CMR-2_Nov_7_26_solicitation_doc.pdf6 pages
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- Replace Chiller at Solnit South Facility, 915 River Rd, Middletown, CT 06457 — closes Nov 24, 2026
- Invitation to Bid for Construction Services – Rowland Government Center Energy Audit Implementation Program — closes Dec 15, 2026
- Old Power Plant Renovations at Holmes Drive, Middletown, CT — closes Dec 16, 2026
- Invitation to Bid for Construction Services — closes Dec 21, 2026
Similar open bids
- Building 141 Generator Replacement — DEPT OF THE NAVY
- Prequalification: E Building Heat Pipe Replacement — UConn Health Center
- Evansville Well Rehabilitation — Meriden, City of
- Platt & Lincoln Wells Rehabilitation — Meriden, City of
- Birth to Three System Request for Proposals (RFP) — Early Childhood, Office of
Closing this week nearby
- Modernization Consulting and Grant Application and Administration Services — closes Nov 9, 2026
- Rental of 400 CFM Low Pressure Air Compressor System — closes Nov 9, 2026
- Replacement of Bridge No. 05350 Bosworth Road over Mashamoquet Brook — closes Nov 9, 2026
- Prospect Police Department Furnace Replacement — closes Nov 9, 2026
- Fire Hydrant Installation and Water Main Wet Cuts – RFP No. SNEW-WD-2026-001 — closes Nov 9, 2026