OpenRFQCloses Jan 22, 2027

Request for Qualifications – Installation of Shore Power Connections at New London State Pier

Connecticut Port AuthorityConnecticut#CPA0026NLSPSPPSPIN

The Connecticut Port Authority is seeking qualified firms to perform civil construction and electrical installation for a shore power system at the New London State Pier. The solicitation is a Request for Qualifications (RFQA), not a bid for priced services. Firms must demonstrate experience and capability in civil and electrical work. The deadline to submit qualifications is January 22, 2027, at 4:00 PM ET. Questions must be submitted by December 4, 2026, at 4:00 PM ET. The work site is at the New London State Pier, New London, CT.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 22, 2027
Time stated in bid documents
Jan 22, 2027, 4:00 PM Eastern Time
Submission
online portal
Documents analyzed
2 published · 1 analyzed
Required submission items
1 items · full checklist with Pro

Scope of work

  • Complete electrical installation and integration
  • Enable vessels to connect to local grid instead of diesel engines
  • Support sustainable port operations and reduce emissions

Steps to Bid

  1. 1

    Review the solicitation document and supporting materials.

  2. 2

    Submit qualifications by January 22, 2027, at 4:00 PM Eastern Time. by Jan 22, 2027, 4:00 PM

  3. 3

    Submit questions by December 4, 2026, at 4:00 PM Eastern Time. by Dec 4, 2026, 4:00 PM

What you'll need

Submission

Online portal

NAICS

237130

How to submit

Submit qualifications via the online portal at Official linkPro

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Work includes furnishing and installing supporting shore power infrastructure at the New London State Pier (NLSP), enabling docked marine vessels to connect to the local electric grid to power onboard services instead of running diesel engines. Firms must demonstrate experience, technical capability, and financial responsibility to perform the civil and electrical aspects of the shore power system. The Authority will evaluate qualifications and select a shortlist of firms to be invited to submit full proposals. No line items or pricing are required at this stage. The deadline for submission of qualifications is January 22, 2027, at 4:00 PM Eastern Time.

Key dates

Questions due
Dec 4, 2026, 4:00 PM Eastern Time
Bids due
Jan 22, 2027

Documents

  • CPA0026NLSPSPPSPIN_Nov_17_26_solicitation_doc.pdf5 pages
  • CT-Port-Authority-RFQ-No.-CPA0026-NLSP-SPP-SPIN.pdf17 pages

See all documents · Download with Pro

Similar bids in Connecticut

Closing soon in Connecticut