Resurfacing of SR 953 (LeJeune Road/NW 42nd Avenue) from N of NW 103rd St to S of NW 135th St, Miami-Dade County
Florida Department of Transportation — FDOTFlorida#T6608
The Florida Department of Transportation is soliciting bids for resurfacing SR 953 (LeJeune Road/NW 42nd Avenue) from north of NW 103rd Street to south of NW 135th Street in Miami-Dade County. Work includes milling existing asphalt, placing Superpave asphaltic concrete, installing concrete curbs and gutters, reconstructing storm drains and inlets, installing guardrails, constructing sidewalks, installing thermoplastic pavement markings, replacing traffic signals and controllers, installing new lighting poles, relocating and removing signs, and performing traffic control. The project is 1.978 miles long, with a 360-day contract duration and a $6,229,913.00 budget.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 2, 2026
- Time stated in bid documents
- Dec 2, 2026, 11:59 PM Eastern Time
- Submission
- mail, hand delivery
- Contract term
- 360 days + None
- Documents analyzed
- 1
Scope of work
- Resurface 1.978 miles of SR 953 from N of NW 103rd St to S of NW 135th St
- Mill existing asphalt pavement (1-inch and 1.5-inch average depth)
- Reconstruct storm drains and inlets (curb, ditch bottom, and manholes)
- Install guardrails (Type I, TL-3)
Steps to Bid
- 1
Register with the Florida Department of Transportation's eProcurement system.
- 2
Review the full solicitation notice and all attached documents, including the bid schedule and specifications.
- 3
Submit questions to the designated contact by the deadline specified in the solicitation. by Dec 2, 2026, 11:59 AM
What you'll need
Contract duration
360 contract days
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
Cancel anytime · no card to browse
Project details
Work also includes bridge deck expansion joint rehabilitation, polymer nosing, and removal of existing structures. The project spans 1.978 miles and is scheduled for 360 contract days with a 10-day contract execution period. The proposal budget estimate is $6,229,913.00.
Key dates
- Pre-bid meeting
- Dec 2, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 2, 2026
Documents
- T6608BSN.pdf6 pages
More from this agency
- Intermediate Bridge Replacement - Duval County, SR 115 (Lem Turner Road) - Bridge #720033 · closes Dec 2, 2026
- Minor Bridge Replacement on Rice Machine Road over Rice Machine Branch (Bridge No. 524139), Holmes County, Florida · closes Dec 2, 2026
- Resurfacing of I-95 (SR 9) from Duval County Line to South of SR 200 in Nassau County · closes Dec 2, 2026
- Resurfacing of SR 934/NW 74 Street Connector, Miami-Dade County · closes Dec 2, 2026
- Resurfacing of SR 16 in St. Johns County from East of CR 2209 to East of Toms Road · closes Dec 2, 2026
Similar bids in Florida
- Intersection Improvements for East County Line Road at Grand Hampton Drive · closes Dec 4, 2026
- Shady Hills Road Sidewalk from Dr. Mary Giella Elementary School to Bosley Drive · closes Dec 8, 2026
- Professional Engineering Services for PD&E Study: Edwards Road from S. Jenkins Road to Selvitz Road · closes Dec 9, 2026
- Resurfacing and Traffic Safety Improvements on State Road A1A and State Road 528, Brevard County, Florida · closes Dec 2, 2026
- County Road 220 Phase 2 Milling and Resurfacing — RFB No. 25/26-119 · closes Nov 30, 2026
Closing soon in Florida
- Care Navigation Services for Alzheimer’s Patients and Caregivers — Florida Alzheimer’s Center of Excellence · closes Nov 30, 2026
- Switch Vehicles · closes Nov 30, 2026
- Procurement of Training Ammunition · closes Dec 1, 2026
- Chiller Preventative Maintenance Services · closes Dec 3, 2026
- Air Force Civil Augmentation Program (AFCAP) VI · closes Dec 3, 2026