OpenConstructionCloses Nov 30, 2026

Emergency Repair of 69kV Transmission Line 1

Keys Energy Services — T & DFlorida#01-27

Keys Energy Services is seeking a contractor to perform emergency repair of 69kV Transmission Line 1. The work includes assessment, temporary stabilization, replacement of damaged conductors and insulators, and full restoration of service. The project is time-sensitive and must be completed under emergency conditions. Bidders must be qualified for high-voltage transmission line work and capable of immediate mobilization. Questions must be submitted by November 13, 2026, at 12:00 PM ET.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 30, 2026
Time stated in bid documents
Nov 30, 2026, 10:00 AM Eastern Time
Submission
electronic portal

Scope of work

  • Replace broken conductors and insulators on Line 1
  • Stabilize and restore full operational capacity
  • Coordinate with Keys Energy Services operations team
  • Perform work under safety and utility standards

Steps to Bid

  1. 1

    Register with Keys Energy Services vendor portal if not already registered.

  2. 2

    Submit questions by November 13, 2026, at 12:00 PM ET. was Nov 13, 2026, 12:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Prepare and submit bid package by November 30, 2026, at 10:00 AM ET. by Nov 30, 2026, 10:00 AM

What you'll need

Submission

Electronic portal

NAICS

237130

How to submit

Submit via the Keys Energy Services vendor portal at Official linkPro. All documents must be uploaded in PDF format. No hard copies accepted.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Work to be performed under emergency conditions with priority scheduling. All materials and labor must meet utility-grade standards for high-voltage transmission systems. The scope includes site access, safety protocols, and coordination with Keys Energy Services operations team.

Key dates

Questions due
Nov 13, 2026, 12:00 PM Eastern Time
Bids due
Nov 30, 2026

More from this agency