OpenConstructionCloses Dec 4, 2026, 10:00 AM CT

Resurfacing on I-40 from near S.R. 53 to the bridge over the Caney Fork River, Smith County

Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN263082

53 to the bridge over the Caney Fork River. The work must be completed by September 30, 2027. Bids are due December 4, 2026, at 10:00 A.M. Central via the Bid Express online portal. A 5% bid bond is required and must be submitted electronically. Bid authorization is available until 4:00 P.M. Central the day before the letting.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 4, 2026, 10:00 AM CT
Time stated in bid documents
Dec 4, 2026, 10:00 AM Central Time
Bid bond
5%
Submission
internet
Documents analyzed
2
Required submission items
4 items · full checklist with Pro

Steps to Bid

  1. 1

    Obtain bid authorization via the Bid Express website by 4:00 P.M. Central the day before the letting. by Dec 3, 2026, 4:00 PM

  2. 2

    Download the Proposal Contract, Plans, and Specifications from the TDOT Construction Division website.

  3. 3

    Review all addenda posted on the Bid Express website by 2:00 P.M. Central the day before the letting. by Dec 3, 2026, 2:00 PM

  4. 4

    Submit the electronic bid bond (5% of the bid amount) via Bid Express by the same deadline. by Dec 4, 2026, 10:00 AM

What you'll need

Contract duration

On or before 9/30/2027

Submission

Internet

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
  • The 4-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Contract No. CN263082, Call No. 054: Resurfacing on I-40 from near S.R. 53 (L.M. 8.60) to the bridge over the Caney Fork River (L.M. 13.04), 4.440 miles. Completion time: On or before 9/30/2027 (See Special Provision 108B). Internet bidding mandatory.

Key dates

Questions due
Dec 3, 2026, 4:00 PM Central Time
Bids due
Dec 4, 2026, 10:00 AM CT

Documents

  • 20261204_NoticeToContractors.pdf14 pages
  • 20261204_InstructionsToBidders.pdf4 pages

See all documents · Download with Pro

More from this agency

Similar bids in Tennessee

Closing soon in Tennessee