OpenConstructionCloses Dec 4, 2026, 10:00 AM CT

Resurfacing on S.R. 69 from Brooksie Access Road to Old Tennessee 69, including bridge repair work — Decatur County

Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN264067

The Tennessee Department of Transportation is soliciting bids for resurfacing 11.77 miles of State Route 69 in Decatur County, from Brooksie Access Road (L.M. 19.73) to Old Tennessee 69 (L.M. 31.50), including bridge repair work. Bids must be submitted electronically via Bid Express by 10:00 A.M. Central Time on December 4, 2026. A 5% bid bond is required. Contractors must be in good standing with the Tennessee Secretary of State. Bidding authorization is available until 4:00 P.M. Central the day before the letting. The Standard Specifications for Road and Bridge Construction, dated April 1, 2026, are incorporated by reference.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 4, 2026, 10:00 AM CT
Time stated in bid documents
Dec 4, 2026, 10:00 AM Central Time
Bid bond
5%
Submission
internet
Documents analyzed
2
Required submission items
3 items · full checklist with Pro

Scope of work

  • Repair bridges along S.R. 69
  • Complete work by 9/30/2027

Steps to Bid

  1. 1

    Download the Proposal Contract, Plans, and Specifications from the TDOT Construction Division website.

  2. 2

    Submit the electronic bid bond (5% of the bid amount) via the Bid Express system. by Dec 4, 2026, 10:00 AM

What you'll need

Contract duration

On or before 9/30/2027

Submission

Internet

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Contract No. CN264067, Call No. 016 — Decatur County Project No. NH/HSIP-69(119), 20S069-F8-006 (PIN 135894.00), 20S069-F3-006 (PIN 135894.00), 20S069-M3-008 (PIN 135894.00). Project length: 11.770 miles. Internet bidding mandatory. Failure to submit may result in non-responsiveness and forfeiture of bid bond.

Key dates

Questions due
Dec 3, 2026, 4:00 PM Central Time
Bids due
Dec 4, 2026, 10:00 AM CT

Documents

  • 20261204_NoticeToContractors.pdf14 pages
  • 20261204_InstructionsToBidders.pdf4 pages

See all documents · Download with Pro

More from this agency

Similar bids in Tennessee

Closing soon in Tennessee