OpenConstructionCloses Dec 4, 2026, 10:00 AM CT

Resurfacing on U.S. 321 (S.R. 35) from U.S. 25 (U.S. 70, S.R. 9) to near St. Tide Hollow Road - Cocke County

Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN261034

321 (S.R. 35) in Cocke County, from U.S. 25 (U.S. 70, S.R. 9) at L.M. 1.03 to near St. Tide Hollow Road at L.M. 4.40, a distance of 3.370 miles. The project must be completed by July 31, 2027. Bids are due via the internet (Bid Express) by 10:00 A.M. Central on December 4, 2026. Internet bidding is mandatory. Bidders must obtain bid authorization by 4:00 P.M. Central the day before the letting. Contractors must be in good standing with the Tennessee Secretary of State. The Department will not execute contracts or approve subcontracts with contractors that are not in good standing. The Standard Specifications for Road and Bridge Construction, dated April 1, 2026, are incorporated by reference. All questions must be directed to the Headquarters Construction Office at (615) 741-2414.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 4, 2026, 10:00 AM CT
Time stated in bid documents
Dec 4, 2026, 10:00 AM Central Time
Bid bond
5%
Submission
internet
Documents analyzed
2
Required submission items
3 items · full checklist with Pro

Steps to Bid

  1. 1

    Obtain bid authorization via the Bid Express website by 4:00 P.M. Central the day before the letting. by Dec 3, 2026, 4:00 PM

  2. 2

    Download the bid documents, including the Proposal Contract, Standard Specifications, and Plans, from the TDOT Construction Division website.

  3. 3

    Ensure the electronic bid bond is submitted via the Bid Express website by the same deadline. by Dec 4, 2026, 10:00 AM

What you'll need

Contract duration

On or before 7/31/2027

Submission

Internet

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Contract No. CN261034, Call No. 010 - Cocke County Project No. STP/HSIP-35(88), 15S035-F8-004 (PIN 132803.00), 15S035-F3-004 (PIN 132803.00): The resurfacing on U.S. 321 (S.R. 35) from U.S. 25 (U.S. 70, S.R. 9) (L.M. 1.03) to near St. Tide Hollow Road (L.M. 4.40). Completion Time - On or before 7/31/2027 (See Special Provision 108B).

Key dates

Questions due
Dec 3, 2026, 4:00 PM Central Time
Bids due
Dec 4, 2026, 10:00 AM CT

Documents

  • 20261204_NoticeToContractors.pdf14 pages
  • 20261204_InstructionsToBidders.pdf4 pages

See all documents · Download with Pro

More from this agency

Similar bids in Tennessee

Closing soon in Tennessee