Resurfacing, Rumble Strips, and Bridge Deck Repairs on SH 135 from MP 14.1 to MP 23.8, Gunnison County, Colorado
Colorado DOT — Region 3Gunnison, Colorado#STR 135A-029 (27560)
Colorado DOT is soliciting bids for resurfacing, rumble strip installation, and bridge deck repairs on SH 135 from MP 14.1 to 23.8 in Gunnison County. The project is estimated at $10–20 million, with a bid deadline of December 10, 2026, at 11:59 PM MT. The resident engineer is Nathan Jean.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 11, 2026
- Time stated in bid documents
- Dec 10, 2026, 11:59 PM Mountain Time
- Submission
- mail, hand delivery, electronic portal
- Contract term
- 120 calendar days from the Notice to Proceed
- Documents analyzed
- 3
Scope of work
- Install rumble strips on the highway
- Repair bridge decks along the route
- Perform other improvements as specified
Steps to Bid
- 1
Register with CDOT's eProcurement portal (Official linkPro) and obtain a vendor ID.
- 2
Review the full bid package, including plans, specifications, and addenda, available at Official linkPro
- 3
Submit questions to Nathan Jean by December 3, 2026, at 11:59 PM MT. by Dec 3, 2026, 11:59 PM
- 4
Submit the complete bid package by December 10, 2026, at 11:59 PM MT. by Dec 10, 2026, 11:59 PM
What you'll need
Submission
Mail, Hand delivery, Electronic portal
NAICS
237131, 237132
How to submit
Submit one original and one electronic copy on a USB drive, sealed in a single envelope. The envelope must be marked 'BID FOR STR 135A-029 (27560)' and delivered to the address above by 11:59 PM MT on December 10, 2026.
In person/mail: Colorado Department of Transportation, Region 3, 1000 10th Street, Gunnison, CO 81230
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project involves resurfacing of State Highway 135 from milepost 14.1 to 23.8 in Gunnison County, Region 3, Colorado. Work includes mill and overlay of asphalt pavement, installation of rumble strips, bridge deck repairs, and other improvements. The project is part of the Colorado Department of Transportation's 2026 construction forecast. The scope is limited to the specified highway segment. The project is scheduled for advertisement on November 19, 2026, with a letting date of December 10, 2026. The resident engineer is Nathan Jean, contactable at (970) 683-6362. The project number is STR 135A-029 (27560).
Key dates
- Questions due
- Dec 3, 2026, 11:59 PM Mountain Time
- Bids due
- Dec 11, 2026
Documents
- CY_2026_Anticipated_Project_Advertisements.pdf6 pages
- GO_Sheet.pdf4 pages
- CDOTPlanHolders.pdf16 pages
More from this agency
- Resurfacing US 285 Poncha Springs North, Chaffee County, Colorado · closes Dec 4, 2026
- Surface Treatment (1 In. Leveling Course with 1.5 In. Overlay) on CO 12 (MP 26.1–70.4), Las Animas County · closes Dec 18, 2026
- Hot mix asphalt roadway resurfacing on SH 22 from MP 0 to MP 2.5 — Adams County · closes Dec 18, 2026
- Mill and Overlay SH8 from Old Kipling (MP 7.11) to Wadsworth (MP 8.65) · closes Dec 18, 2026
- Safety & Multimodal Improvements - Medians, Crossings, Bike/Ped - Sheridan SH95 17th to 26th · closes Dec 18, 2026
Similar bids near Gunnison
- Bridge Rehabilitation on US 50 from MP 132 to MP 136.5, Gunnison County, Colorado · Gunnison · closes Dec 4, 2026
Closing soon near Gunnison
- Septic Pump Truck Tank Replacement for Curecanti National Recreation Area · Gunnison · closes Dec 1, 2026