OpenIFBCloses Dec 15, 2026

Roofing Project - SSA Operations Building

Central Florida Tourism Oversight District — Construction ManagementOrlando, Florida#ITB # C007073

The project involves the removal and replacement of existing roofing systems, including insulation, flashings, drainage, and rooftop components. It also includes mechanical/electrical equipment removal and reinstallation, skylight removal, deck opening infill, and interior ceiling and lighting replacement. The contractor must provide all labor, supervision, materials, equipment, testing, and permitting. A bid bond is required. The project duration is estimated at 105 days from the Notice to Proceed, with Substantial Completion by April 25, 2027, and Final Completion by May 10, 2027.

On PublicBidSearch: the original bid posting, 14 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 15, 2026
Time stated in bid documents
Dec 15, 2026, 3:16 PM Eastern Time
Bid bond
Required
Performance bond
Required
Payment bond
Required
Submission
electronic portal
Documents analyzed
14 published · 10 analyzed

Steps to Bid

What you'll need

Contract duration

105 Days from Notice to Proceed

Submission

Electronic portal

NAICS

72120000, 72121100, 72152600, 72152601

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The scope of work for the SSA Operations Bldg. Specific tasks include demolition of existing roofing membranes, insulation, cover boards, and flashings down to the structural metal roof deck. The existing roof decking and supporting substrates will be inspected for deterioration, corrosion, or damage. Surface corrosion will be treated, and necessary repairs to deteriorated decking will be coordinated with the District. Deteriorated blocking and associated materials will be removed and replaced as required. Unit price work includes removal and replacement of 60 LF of 2"x6" wood blocking, 200 LF of 2"x8" wood blocking, and 200 SF of steel roof decking. Repairing/painting of 100 SF of corroded steel roof deck surfaces is also included. The new roofing system will be a multi-ply modified bitumen system with new tapered insulation for positive drainage, new roof membrane flashings, parapet treatments, metal coping, equipment curb flashings, and penetration seals. Rooftop walkway protection membranes will be installed around equipment and roof access points. Roof drainage improvements include removing and replacing primary and secondary overflow roof drains, reconnecting new drains to existing piping, and providing tapered insulation crickets and drain sumps. Skylight removal will involve structural framing, metal decking, and infill to close openings, with associated interior ceiling and finish restoration. Electrical modifications include disconnecting, raising, and reconnecting rooftop HVAC units and electrical penetrations. New interior lighting fixtures will be installed. Conduits will be supported and routed independently, with MC cable prohibited. Panel directories and labels will be provided. Existing rooftop mechanical and electrical components will be temporarily disconnected, relocated, or reinstalled as needed. Designated roof access hatches, curbs, supports, and related components will be replaced. Existing conduits, supports, piping, and roof penetrations will be modified and reinstalled. Masonry waterproofing includes surface preparation, repairs, and application of acrylic waterproof coating, with temporary removal and reinstallation of wall-mounted equipment.

Key dates

Pre-bid meeting
Nov 18, 2026, 6:00 AM Eastern Time
Bids due
Dec 15, 2026

Documents

  • 20261112143540982_Bidder_Requirements_Checklist_v.5_tlk_edits_r1.pdf1 pages
  • 20261110162627839_SA-01_-_CFTOD_Insurance_Requirements_REV_02.27.25.pdf2 pages
  • 20240715161454675_Project_Specific_Safety_Plan_Sample_Form_CFTOD_.pdf2 pages
  • 20240812165440549_RCES_Confined_Space.pdf3 pages
  • 20250929173402807_SAMPLE_-_Construction_Agreement_Bond_Required_.pdf76 pages
  • 20261112151029637_EXHIBIT_A-_Scope_of_Services.pdf7 pages
  • 20251222151520805_Affidavit_of_Eligibility_Form_-_Buy_Local_or_Veteran_Small.pdf1 pages
  • 20251222151445809_Affidavit_of_Eligibility_Form_-_Opportunity_Zone_Program_v.pdf1 pages

6 more files

See all documents · Download with Pro

More from this agency

Similar bids near Orlando

Closing soon near Orlando