Springfield Missouri City Hall Audiovisual Systems
City of SpringfieldSpringfield, Missouri#044-2027IFB
The City of Springfield is soliciting bids for design-build AV integration services for the City Hall renovation. A pre-bid conference is scheduled for November 17, 2026, and site visits are on November 18 and 19, 2026. A bid bond of at least 5% of the total bid price is required. Performance and Labor & Materials Payment Bonds will be required upon award. Prevailing wage laws apply to public works projects over $75,000, and service contracts over $5,000 require compliance with work authorization laws.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 10, 2026, 3:00 PM CT
- Time stated in bid documents
- Dec 10, 2026, 3:00 PM Central Time
- Bid bond
- 5%
- Performance bond
- Required
- Payment bond
- Required
- Submission
- electronic portal
- Documents analyzed
- 2 published · 1 analyzed
Scope of work
- Comprehensive audiovisual system requirements.
- Bids submitted electronically via Euna OpenBids.
Steps to Bid
- 1
Register with Euna OpenBids (formerly DemandStar).
[link available with Pro]
- 2
Attend the pre-bid conference. was Nov 17, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
Conducted via videoconference. Email [email available with Pro] for link and password. Attendance is encouraged.
- 3
Conduct site visits. was Nov 18, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
First site visit: November 18, 2026, from 2:00 – 4:00 P.M. (CST) at Historic City Hall, 830 N. Boonville Ave, Springfield, MO 65802 – Gate at the Northeast Side of the Building.
- 4
Conduct site visits. was Nov 19, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
Second site visit: November 19, 2026, from 2:00 – 4:00 P.M. (CST) at Historic City Hall, 830 N. Boonville Ave, Springfield, MO 65802 – Gate at the Northeast Side of the Building.
- 5
Submit questions in writing. by Nov 30, 2026, 12:00 PM
Submit questions via email to the Buyer, Morgan Blankenship.
- 6
Submit bid electronically. by Dec 10, 2026, 3:00 PM
Bids must be uploaded into the Euna OpenBids (formerly DemandStar) e-bidding system.
What you'll need
Bid security
RequiredThe Contractor shall furnish a Performance Bond and a Labor and Materials Payment Bond with surety approved by the City and on the forms approved by the City. Each bond shall be in the full amount of the contract conditioned upon the full and faithful performance of all major terms and conditions of this contract and payment of all labor and material suppliers.
Contract duration
All work must be completed no later than August 31, 2027.
Submission
Electronic portal
How to submit
Bids must be received electronically in the City’s e-bidding service provider Euna OpenBids (formerly DemandStar) by 3:00 P.M. (CST), on December 10, 2026. HAND DELIVERED, FAXED, OR EMAILED BIDS WILL NOT BE ACCEPTED.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
This package details the requirements for a comprehensive audiovisual system. Bids must be submitted electronically through Euna OpenBids (formerly DemandStar) by 3:00 P.M. (CST) on December 10, 2026. A pre-bid conference is scheduled for November 17, 2026, at 10:00 A.M. (CST) via videoconference. All wages paid for public works construction projects valued at more than $75,000.00 must comply with Missouri prevailing wage law. For contracts for services greater than $5,000, the successful bidder must provide an affidavit affirming they do not knowingly employ unauthorized aliens and documentation of enrollment in a federal work authorization program. All bids should include a signed and notarized Work Authorization Affidavit and the electronic signature page from the E-Verify program. A bid bond of not less than five percent (5%) of the total bid price is required.
Key dates
- Questions due
- Nov 30, 2026, 12:00 PM Central Time
- Pre-bid meeting
- Nov 17, 2026, 10:00 AM Central Time
- Site visit
- Nov 18, 2026, 2:00 PM Central Time
- Bids due
- Dec 10, 2026, 3:00 PM CT
Documents
- BID_20044-2027IFB.pdf68 pages
- BID 044-2027IFB Attachment 1 - Design Package.pdf
More from this agency
- Liquid Aluminum Sulfate Supply Contract · closes Nov 30, 2026
- Asset Management Plan – Springfield-Greene County Parks · closes Dec 1, 2026
- School Zone Flashing Beacon System Replacement · closes Dec 2, 2026
- Basketball League Administrator · closes Dec 3, 2026
- Southwest Wastewater Treatment Plant Centrifuge Replacement · closes Dec 3, 2026
Similar bids near Springfield
- Audio Visual Equipment (Bissett) · Springfield · closes Dec 2, 2026
- ManageEngine Maintenance · Springfield · closes Dec 8, 2026
- E Rate 2027 · Spokane
Closing soon near Springfield
- Meadows Water Treatment Facility and Intake Station Emergency Backup Generators · Branson · closes Dec 1, 2026
- Agricultural Land Lease - 3180 S Hazeltine Brookline, MO · Springfield · closes Dec 1, 2026
- Temporary Repair of Salt Shed Roof · Springfield · closes Dec 1, 2026
- ACW Ranger District Toilet Pumping Services · Ava · closes Dec 1, 2026
- City Hall Ground Floor Renovations – Request for Qualifications · Branson · closes Dec 3, 2026