Traffic Signal Modifications (Signal Installations with Flashing Beacons and Pedestrian Crosswalk/Flashing Beacons) on SR-88 at Multiple Intersections, Coffee County, Alabama
Alabama Department of TransportationAlabama#ATRP2-16-2026-195COFFEE
The Alabama Department of Transportation is soliciting sealed bids for the construction of traffic signal modifications, including signal installations with flashing beacons and pedestrian crosswalk/flashers, at multiple intersections along SR-88 in Coffee County, Alabama. Bids must be submitted by 10:00 AM on December 4, 2026, to the Alabama Department of Transportation in Montgomery. A bid bond of 5% of the bid amount (up to $50,000) is required. Bidders may purchase plans and proposals for $15.00 and $5.00 respectively. The bracket estimate is $1,208,520 to $1,477,080, but this is not used in bid evaluation.
On PublicBidSearch: the newspaper notice and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Submission
- mail, hand delivery
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Install pedestrian crosswalk flashing beacons at multiple locations
- Modify traffic signals at Watts Street, Lee Street, College Street, Harrison Street, Alberta/Webe Curenton Drive, East Grubbs Street, and Farmers Market near K.
- Total project length: 0.531 miles
Steps to Bid
- 1
Review the full notice and associated documents (plans, specifications, bid form) available at the Alabama Department of Transportation, Montgomery, AL.
- 2
Purchase the bid proposal for $5.00 and plans for $15.00 per set, payable by check to the Alabama Department of Transportation.
- 3
Prepare and submit a sealed bid with a bid bond of 5% of the bid amount (maximum $50,000.00), payable to the Alabama Department of Transportation. by Dec 4, 2026, 10:00 AM
- 4
Submit the bid in person or by mail to the Director of Transportation, Alabama Department of Transportation, 1409 Coliseum Boulevard, Room E-108, Montgomery, AL 36110. by Dec 4, 2026, 10:00 AM
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199
How to submit
Bids must be sealed and submitted in person or by mail to the Alabama Department of Transportation, Room E-108, Montgomery, AL 36110. A bid bond of 5% of the bid amount (up to $50,000.00) must accompany the bid, payable to the Alabama Department of Transportation.
In person/mail: 1409 Coliseum Boulevard, Room E-108, Montgomery, AL 36110
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
A bidding proposal may be purchased for $5.00. Plans are available for $15.00 per set. All plans and proposals are available at the Alabama Department of Transportation, 1409 Coliseum Boulevard, Room E-108, Montgomery, AL 36110. Checks must be made payable to the Alabama Department of Transportation. Plans and proposals will be mailed only upon receipt of remittance. No refunds will be issued. This bracket is for informational purposes only and should not be used in bid preparation. Bidders must not exceed the amount of uncompleted work allowed under their qualification certificate.
Key dates
- Bids due
- Dec 4, 2026, 10:00 AM CT
More from this agency
- Intersection Improvements on SR-69 from Mimosa Park Road to I-20/I-59 Overpass, Tuscaloosa County, Alabama · closes Dec 4, 2026
- Safety Widening, Planing, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, Guardrail Installation, and Traffic… · closes Dec 4, 2026
- Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, Traffic Signal Upgrades, and Traffic Stripe on SR… · closes Dec 4, 2026
- Micro-Milling, Resurfacing, Guardrail Installation (Steel Blockout Replacement), and Traffic Stripe on SR-59 from CR… · closes Dec 4, 2026
- Micro-Milling, Resurfacing (Micro-Surfacing Seal Coat, Type II and Type III), and Traffic Stripe on SR-1 (US-431) from… · closes Dec 4, 2026
Closing soon in Alabama
- Push Bar Replacement on Front Door at Dothan Armory · closes Nov 30, 2026
- Purchase of Non-Operable 2010 Scag Tiger Cat 48-Inch Zero-Turn Mower · closes Dec 1, 2026
- Dormitory Fencing Construction · closes Dec 3, 2026
- Houston County Resurfacing, Guardrail, and Guardrail End Anchors on SR-1 (US-231) · closes Dec 4, 2026
- Clarke County — Roadway Improvements (Adding Two-Way Left Turn Lanes) on SR-13 (US-43) at a Point Near Old Drive-In Road · closes Dec 4, 2026