Stoddard-Antrim-Hillsborough NH 9 Resurfacing - Tier 2 Roadways
New Hampshire DOT — NHDOTStoddard-Antrim-Hillsborough, New Hampshire#45084
New Hampshire DOT is soliciting bids for resurfacing 13.7 miles of NH 9 across Stoddard, Antrim, and Hillsborough counties. Work includes cold planing, asphalt paving, guardrail installation, pavement marking, and erosion control. The estimated contract value is $7,107,180.15. The project is funded under Pave-T2-Resurf with federal dollars. Project manager is Cassandra Burns.
On PublicBidSearch: the original bid posting, 7 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 19, 2026
- Time stated in bid documents
- Nov 19, 2026, 2:00 PM Eastern Time
- Submission
- electronic portal
- Documents analyzed
- 7 published · 6 analyzed
Scope of work
- Remove existing bituminous curb and guardrail
- Apply tack coat and asphalt emulsion
- Place HBP-3/4 binder mix and bonded wearing course
- Install beam guardrail and delineators
Steps to Bid
- 1
Register and prequalify with NHDOT by submitting the RFP form at least 10 days before bid opening.
- 2
Obtain the online bidding access password card by submitting the RFP form and receiving approval.
- 3
Submit all questions in writing to Cassandra Burns at [email available with Pro] at least five business days before the bid opening. was Nov 14, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Access the online bidding portal at Official linkPro to view and download the full bid package.
What you'll need
Prequalification
RequiredContract duration
13.7 miles of resurfacing on NH 9 across three towns in District 4
Submission
Electronic portal
NAICS
237131
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Work includes removal of existing bituminous curb and guardrail, cold planing, application of tack coat and asphalt emulsion, placement of HBP-3/4 binder mix and bonded wearing course, crack filling and inlay, installation of beam guardrail and delineators, pavement marking with preformed tape and polyurea, and temporary erosion control. The project is part of the Tier 2 Federal Resurfacing program.
Key dates
- Bids due
- Nov 19, 2026
Documents
- current-ad-schedule.pdf17 pages
- stoddard-antrim-hillsborough-45084.pdf2 pages
- 45084.pdf4 pages
- 45084-stoddard-antrim-hillsborough.pdf2 pages
- 45084-stoddard-antrim-hillsborough_0.pdf2 pages
- 45084-stoddard-antrim-hillsborough_4.pdf2 pages
- 45084-stoddard-antrim-hillsborough_5.pdf2 pages
More from this agency
- Rehabilitation of Bridge Carrying US 3 and NH 11 over Mile Hill Road in Laconia, NH (121/028) — closes Nov 19, 2026
- Hampton-North Hampton Bridge Preservation Project (45127) — closes Nov 19, 2026
- Statewide Chip Seal 2026 - Chip Sealing of Tier 3 and Tier 4 Roadways — closes Nov 19, 2026
- Reconstruction of Railway-Highway Crossings at US 2 and NH 16, Gorham, NH — closes Nov 19, 2026
- NHVH Tarr ADA & IPC Compliance – Tilton, NH — closes Dec 2, 2026
Similar open bids
- BID 27-10 Old Dover Road / Tebbetts Road Roundabout Project — City of Rochester
- RFP 13-27 White Park Hockey Rink Replacement — City of Concord
- Mascenic School District: E-Rate FY2027 Category 1 - Internet Access and Data Transmission Service — Mascenic School District
- Pavement Resurfacing on 14.0 Miles of Road in Districts 4 and 5, New Hampshire — New Hampshire Department of Transportation
Closing this week nearby
- RDMV 344: Motor Vehicle Registration Paper Shell — closes Nov 19, 2026
- Manchester Skate Park and Harvell Street Improvements — closes Nov 19, 2026