T32-D3-Drain. Rehab-SR401 Spalding-194526
Department of TransportationSpalding, Georgia#48400-eRFQ-002142-2027
Work includes vegetation clearing, culvert rehab, flume and riprap installation, grading, and erosion control. Bids must be submitted electronically via GA@WORK Marketplace by November 12, 2026, at 5:00 PM EST. Questions must be submitted by November 3, 2026, at 2:00 PM EST. The awarded contractor must begin work within 60 days of the Prework Meeting and complete all work within 170 days. The contractor must provide 100% performance and payment bonds, a Georgia Security and Immigration Compliance Act Affidavit, current licenses, and evidence of insurance. Mandatory post-bid documents must be submitted within 10 calendar days of award notification. The contractor must submit a detailed work plan, traffic control plan, equipment list, and personnel list. The contractor must comply with MUTCD, GDOT Standard Specifications, and Construction Details. The contractor must have a certified Worksite Erosion Control Supervisor and a Worksite Traffic Control Supervisor on site at all times. The contractor must report all incidents or accidents within two business days. Liquidated damages apply at $160 per day for contracts under $1.5M, and $479 per day for contracts between $1.5M and $3M. The contractor must submit digital MS4 permit-related activity tracking data via Excel to the District Maintenance Contract Manager with each invoice.
Overview
- Due
- Nov 12, 2026
- Time stated in bid documents
- Nov 12, 2026, 5:00 PM Eastern Time
- Bid bond
- 100%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- 170 days from the Prework Meeting
- Documents analyzed
- 2
Scope of work
- Vegetation clearing along SR 401, MP 206.4–206.9, Spalding County, GA
- Culvert rehabilitation and flume installation at MP 206.74 on SR 401
- Riprap and apron installation at the outlet of the culvert
- Installation of Type C silt fence and other erosion control devices
- Traffic control and lane closure management
Steps to Bid
- 1
Register and log in to GA@WORK Marketplace
- 2
Review the ITB, Exhibits 3 and 4, and all attachments
- 3
Submit written questions to the Issuing Officer by 2:00 PM EST on November 3, 2026 was Nov 3, 2026, 2:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Prepare and submit the completed ITB Bid Form, including all required attachments, via GA@WORK Marketplace by 5:00 PM EST on November 12, 2026 was Nov 12, 2026, 5:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 5
If selected, submit mandatory post-bid documents within 10 calendar days of award notification
What you'll need
Contract duration
170 calendar days from the Prework Meeting
Submission
Electronic portal
NAICS
237190
How to submit
All responses must be submitted electronically via GA@WORK Marketplace. The completed ITB Bid Form (Tables 1–15), including all required attachments, must be uploaded as a single file. The form must be signed by an authorized representative. The submission must be completed by the deadline. The Department will not accept paper or email submissions.
In person/mail: Georgia Department of Transportation, 643 Highway 15 South, Tennille, GA 31089
Get alerts for bids like this
New erosion control bids in Georgia
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The scope is defined in Exhibit 3 (Project Scope of Work) and Exhibit 4 (Locations, Description and Estimated Quantities). The Department reserves the right to reject any or all bids and to waive technicalities. The ITB is conducted electronically via GA@WORK Marketplace. The Department will issue a Notice of Award approximately 2–4 weeks after bid closing. The performance and payment bonds must be 100% of the award price, issued by a surety authorized in Georgia, listed in U.S. Treasury Circular No. 570, and rated A- or better by A.M. Best. Work must be completed in accordance with the milestones in Table 9.1, with 99% of work completed and inspected by Day 160, and 100% by Day 170 after the Prework Meeting. The contractor must notify the Thomaston District Office 48 hours prior to starting work. The contractor is responsible for all utility locates, traffic control, and erosion control measures. The contractor must also submit a Record of Training (Sign-In Sheet) for all personnel assigned to MS4-related activities. The contractor must comply with the State of Georgia’s Sexual Harassment Prevention Policy and complete annual training.
Documents
- 1465523-2121552162SR_401_Drainage_Rehab__2_P.docx
- 1465523-event.pdf5 pages
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- T32-D6-Drainage A1 Bartow Gordon-194613 — closes Nov 17, 2026
- T32-D6-Drainage A1 Cherokee-Pickens-194617 — closes Nov 17, 2026
- T32-D1-ShortLinePave-Sr 9 Lumpkin-194032 — closes Nov 17, 2026
- Public Relations and Communication Services for Georgia Department of Transportation — closes Nov 18, 2026
- Routine Maintenance Services - District 3 — closes Nov 19, 2026
Closing this week nearby
- Control, Multifunctional (NSN 2590150266566) — closes Nov 13, 2026
- Professional Consulting Service For Macon-Bibb County Safe Streets and Roads — closes Nov 12, 2026
- Houston County Public Library: E-Rate FY2027 Category 1 - Internet Access and Managed Firewall Services — closes Nov 12, 2026
- Replacement of Existing HVAC Units at Wilkinson County High School’s Gym and Auditorium — closes Nov 12, 2026
- Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1 — closes Nov 12, 2026