ClosedRFQClosed Nov 12, 2026

T32-D3-Drain. Rehab-SR401 Spalding-194526

Department of TransportationSpalding, Georgia#48400-eRFQ-002142-2027

Work includes vegetation clearing, culvert rehab, flume and riprap installation, grading, and erosion control. Bids must be submitted electronically via GA@WORK Marketplace by November 12, 2026, at 5:00 PM EST. Questions must be submitted by November 3, 2026, at 2:00 PM EST. The awarded contractor must begin work within 60 days of the Prework Meeting and complete all work within 170 days. The contractor must provide 100% performance and payment bonds, a Georgia Security and Immigration Compliance Act Affidavit, current licenses, and evidence of insurance. Mandatory post-bid documents must be submitted within 10 calendar days of award notification. The contractor must submit a detailed work plan, traffic control plan, equipment list, and personnel list. The contractor must comply with MUTCD, GDOT Standard Specifications, and Construction Details. The contractor must have a certified Worksite Erosion Control Supervisor and a Worksite Traffic Control Supervisor on site at all times. The contractor must report all incidents or accidents within two business days. Liquidated damages apply at $160 per day for contracts under $1.5M, and $479 per day for contracts between $1.5M and $3M. The contractor must submit digital MS4 permit-related activity tracking data via Excel to the District Maintenance Contract Manager with each invoice.

Open Original Bid Source Pro

Overview

Due
Nov 12, 2026
Time stated in bid documents
Nov 12, 2026, 5:00 PM Eastern Time
Bid bond
100%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Contract term
170 days from the Prework Meeting
Documents analyzed
2

Scope of work

  • Vegetation clearing along SR 401, MP 206.4–206.9, Spalding County, GA
  • Culvert rehabilitation and flume installation at MP 206.74 on SR 401
  • Riprap and apron installation at the outlet of the culvert
  • Installation of Type C silt fence and other erosion control devices
  • Traffic control and lane closure management

Steps to Bid

  1. 1

    Register and log in to GA@WORK Marketplace

  2. 2

    Review the ITB, Exhibits 3 and 4, and all attachments

  3. 3

    Submit written questions to the Issuing Officer by 2:00 PM EST on November 3, 2026 was Nov 3, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Prepare and submit the completed ITB Bid Form, including all required attachments, via GA@WORK Marketplace by 5:00 PM EST on November 12, 2026 was Nov 12, 2026, 5:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  5. 5

    If selected, submit mandatory post-bid documents within 10 calendar days of award notification

What you'll need

Contract duration

170 calendar days from the Prework Meeting

Submission

Electronic portal

NAICS

237190

How to submit

All responses must be submitted electronically via GA@WORK Marketplace. The completed ITB Bid Form (Tables 1–15), including all required attachments, must be uploaded as a single file. The form must be signed by an authorized representative. The submission must be completed by the deadline. The Department will not accept paper or email submissions.

In person/mail: Georgia Department of Transportation, 643 Highway 15 South, Tennille, GA 31089

Get alerts for bids like this

New erosion control bids in Georgia

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The scope is defined in Exhibit 3 (Project Scope of Work) and Exhibit 4 (Locations, Description and Estimated Quantities). The Department reserves the right to reject any or all bids and to waive technicalities. The ITB is conducted electronically via GA@WORK Marketplace. The Department will issue a Notice of Award approximately 2–4 weeks after bid closing. The performance and payment bonds must be 100% of the award price, issued by a surety authorized in Georgia, listed in U.S. Treasury Circular No. 570, and rated A- or better by A.M. Best. Work must be completed in accordance with the milestones in Table 9.1, with 99% of work completed and inspected by Day 160, and 100% by Day 170 after the Prework Meeting. The contractor must notify the Thomaston District Office 48 hours prior to starting work. The contractor is responsible for all utility locates, traffic control, and erosion control measures. The contractor must also submit a Record of Training (Sign-In Sheet) for all personnel assigned to MS4-related activities. The contractor must comply with the State of Georgia’s Sexual Harassment Prevention Policy and complete annual training.

Documents

  • 1465523-2121552162SR_401_Drainage_Rehab__2_P.docx
  • 1465523-event.pdf5 pages

See all documents · Download with Pro

Contact

Agency contact for this bidName, email & phone — included with ProPro