PCC Slab Replacement on SR 402/I-20 in McDuffie and Columbia Counties, GA
Department of TransportationMcDuffie And Columbia, Georgia#48400-eRFQ-002234-2027
GDOT seeks bids for full-depth PCC slab replacement on SR 402/I-20 from MP 172.82 to 194 in McDuffie and Columbia Counties. Work includes slab removal, underdrain installation, concrete placement, joint sealing, and traffic control. The bid must be submitted electronically via GA@WORK Marketplace. The Department may reject any or all bids. Work must begin within 30 days and be completed within 240 days of the Prework Meeting.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 15, 2026
- Time stated in bid documents
- Dec 15, 2026, 5:00 PM Eastern Time
- Submission
- electronic portal
- Contract term
- 240 days from the Prework Meeting
- Documents analyzed
- 2
Scope of work
- Replace 2,025 cubic yards of damaged PCC slabs on SR 402/I-20
- Install 12-inch rock underdrain systems at designated locations
- Prepare base material and place 500 tons of GAB
- Clean and seal concrete-to-concrete and concrete-to-asphalt joints
- Remove and dispose of excavated material at an approved site
- Restore damaged striping, RPMs, and preformed markings
Steps to Bid
- 1
Register and log in to GA@WORK Marketplace.
- 2
Review the full solicitation, including Exhibits 3 and 4, and all attachments.
- 3
Submit written questions to the Issuing Officer by 12/8/2026 at 2:00 PM ET. by Dec 8, 2026, 2:00 PM
- 4
Prepare and submit a complete, signed bid response via GA@WORK Marketplace by 12/15/2026 at 5:00 PM ET. by Dec 15, 2026, 5:00 PM
What you'll need
Prequalification
RequiredContract duration
240 calendar days from the Prework Meeting
Submission
Electronic portal
NAICS
237130
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The Georgia Department of Transportation (GDOT) is seeking bids for full-depth Portland Cement Concrete (PCC) slab replacement on State Route 402/I-20 in McDuffie and Columbia Counties, from milepost 172.82 to 194. The scope is governed by GDOT Standard Specifications, including Section 452 for full-depth slab replacement, and requires compliance with the Qualified Products List (QPL) for all materials. The Contractor must provide a detailed work plan, traffic control plan, equipment and personnel list, and submit mandatory pre-award documents. The Department reserves the right to reject any or all bids and to waive technicalities.
Key dates
- Questions due
- Dec 8, 2026, 2:00 PM Eastern Time
- Bids due
- Dec 15, 2026
Documents
- 1479103-2136961831PCC_SR_402_McDuffie_Columbia_P.docx
- 1479103-event.pdf5 pages
More from this agency
- T32-D1-Brdg.Mtc.-VogleSt.Pk.-Union-195036 · closes Dec 15, 2026
- T32-D1-Drainage-SR 400-Dawson-193267 · closes Dec 15, 2026
- Routine Maintenance Services for GDOT District 1 · closes Dec 16, 2026
- Routine Maintenance Services for GDOT District 7 · closes Dec 16, 2026
- Welcome Center Integrated Facility Services · closes Dec 17, 2026
Similar bids in Georgia
- North River Gap Sidewalk Project · closes Jan 7, 2027
- Windsor Parkway Sidewalk Project · closes Dec 29, 2026
- North Green Street Sidewalk Improvements, City of Swainsboro, Georgia · closes Dec 3, 2026
- Glenwood Sidewalk Improvement Project Phase III (24 Months) · closes Dec 4, 2026
- Carver Lake Park – Phase 1 · closes Dec 16, 2026
Closing soon in Georgia
- West Banks Timber Sale Preparation Services – Chippewa National Forest · closes Nov 29, 2026
- TELFAIR COUNTY FY 2026 LRA AND FY 2026 LMIG PROJECTS · closes Nov 30, 2026
- Pope High School Grandstand Improvements · closes Dec 2, 2026
- Investment Advisory Services · closes Dec 2, 2026
- City of Cartersville Comprehensive Plan 5-Year Update · closes Dec 4, 2026