OpenIFBCloses Dec 14, 2026

US36 Wildlife Crossings 30% Engineering Design Project

Boulder CountyBoulder, Colorado#RFP-332-26

The project includes one overpass and three underpasses, exclusionary fencing, jump-outs, and associated infrastructure improvements. The work is located between Mileposts 27.95 and 21.8, primarily within CDOT’s Right of Way. Proposals must be submitted by 2026-12-14T14:00 MT via the BonfireHub portal. Bidders may submit questions by 2026-11-24T14:00 MT. The solicitation is open to all qualified bidders.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 14, 2026
Time stated in bid documents
Dec 14, 2026, 2:00 PM Mountain Time
Submission
electronic portal

Scope of work

  • Develop exclusionary fencing and jump-outs for wildlife mitigation
  • Improve existing structures and access points within CDOT ROW
  • Assess impacts to private property during design phase
  • Provide detailed CDOT cost estimate and technical specifications

Steps to Bid

  1. 1

    Register on the BonfireHub portal at Official linkPro

  2. 2

    Submit questions to the procurement team by 2026-11-24T14:00 MT via the BonfireHub portal. was Nov 24, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Prepare and submit a complete proposal via the BonfireHub portal by 2026-12-14T14:00 MT. by Dec 14, 2026, 2:00 PM

What you'll need

Submission

Electronic portal

How to submit

Proposals must be submitted electronically via the BonfireHub portal at Official linkPro. All required forms and documents must be uploaded in the portal before the deadline.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Vrain Creek (Milepost 21.8). The project includes one overpass and three underpasses, exclusionary fencing, jump-outs, improvements to existing structures, road and driveway modifications, construction access points, and staging areas. The primary infrastructure is within CDOT’s Right of Way, except for the overpass location, which also includes BCPOS property. Impacts to other properties will be assessed during the design phase. The project is a multi-year effort in partnership with CDOT and Colorado Parks and Wildlife (CPW). The project is not a sole-source procurement. The solicitation is not a grant or funding opportunity. The solicitation is not a job posting or public meeting notice.

Key dates

Questions due
Nov 24, 2026, 2:00 PM Mountain Time
Bids due
Dec 14, 2026

More from this agency

Similar bids near Boulder County

Closing soon near Boulder County