Pilot-Scale Direct-Fired Cement Kiln System
Department of Energy — ALLIANCE FOR ENERGY INNOVATION, LLC - DOE CONTRACTORGolden, Colorado#AFQ-2027-00113
The National Laboratory of the Rockies (NLR) seeks a subcontractor to design, build, test, deliver, and commission a pilot-scale direct-fired cement kiln system. The system includes a horizontal rotating kiln (15–24 in diameter, 15–30 ft long) with adjustable slope and speed, a natural gas-fired burner, a refractory-lined hood rated to 3,000 °C, and a removable burner mounting for future hydrogen or plasma burners. The kiln must produce clinker at 100 kg/hr (max) and 25 kg/hr (turndown), with a refractory rated for 1,600 °C continuous service. Ancillary equipment includes a screw feeder and hopper (0–170 kg/hr), a ball mill for raw and clinker grinding (200 kg/hr raw, 100 kg/hr clinker to d90 <50 μm), an air-cooled clinker cooler (reducing clinker to ≤100 °C), and environmental controls: cyclonic dust collector, baghouse, and afterburner. The system must be integrated into NLR’s covered pavilion, using on-site AC power and natural gas. The Subcontractor must provide a control system with PLC, HMI, OPC UA and Modbus TCP interfaces, a thermal camera (IP66, NIST-traceable calibration), and safety interlocks. The Subcontractor must conduct a high-level design review, bill of materials review, final design review, factory acceptance test (FAT), delivery to Flatirons Campus (19001 W 119th Ave, Arvada, CO 80007), and site acceptance test (SAT) with 8 hours of continuous operation at 1,600 °C and 100 kg/hr clinker production. The Subcontractor must provide 16 hours of operator training, a spare parts list, 12-month warranty, and final operational documentation. The Subcontractor must submit a completed 'Proposed Payment Schedule' and 'Representations & Certifications for Sub-
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 26, 2027
- Time stated in bid documents
- Jan 25, 2027, 5:00 PM Mountain Time
- Submission
- Contract term
- 25 months
- Documents analyzed
- 5
Steps to Bid
What you'll need
Submission
NAICS
333248
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The system shall be integrated with NLR’s covered pavilion, on-site AC power (480 V, 3-phase, 60 Hz), and natural gas supply.
Key dates
- Questions due
- Dec 18, 2026, 5:00 PM Mountain Time
- Bids due
- Jan 26, 2027
Documents
- NLR_Request_For_Proposal_No._AFQ-2027-00113.pdf9 pages
- Attachment_1_-_Statement_of_Work.pdf8 pages
- Attachment_2_-_Technical_Specifications.pdf9 pages
- Attachment_3_-_Sample_Subcontract_Schedule_-_Firm_Fixed_Price.pdf22 pages
- Attachment_4_-_Proposed_Payment_Schedule.xlsx
More from this agency
- Sun Net iTOA Software Maintenance Support Renewal – Annual Contract · closes Dec 2, 2026
- SIMPLOT MINE LINE HARDWARE · closes Dec 14, 2026
- Material/Hardware & Wire/Cable for Archer-Cheyenne · closes Dec 14, 2026
Similar bids near Golden
- 38th West Improvements · Wheat Ridge · closes Jan 5, 2027
- Fees & Services Cost Recovery Analysis – Request for Information (RFI) · Thornton · closes Dec 19, 2026
- R1 PS East 60th Avenue Multimodal Connections Planning and Environmental Linkages Study Services · Denver · closes Dec 3, 2026
- US36 Wildlife Crossings 30% Engineering Design Project · Boulder County · closes Dec 14, 2026
- Design-Build Services for South Boulder Rd Slip Lining Project · Louisville · closes Dec 18, 2026
Closing soon near Golden
- Grants Consultant for Public Health · Boulder · closes Nov 30, 2026
- As-Needed Emergency Board-Up, Temporary Fencing, and Site Security Services Per City Specifications · Lakewood · closes Dec 1, 2026
- Belleview Park Enhancements · Englewood · closes Dec 1, 2026
- West Dartmouth Avenue Multimodal Safety Improvements Project · Englewood · closes Dec 1, 2026
- RFP: Boettcher Concert Hall Renovation CM/GC · Denver · closes Dec 2, 2026