OpenConstructionCloses Dec 18, 2026, 11:00 AM CT

Bridge Replacement Over Middle Fabius River

Missouri Department of Transportation — MoDOTMissouri#261218-B04

This solicitation is for the replacement of a bridge over the Middle Fabius River on Route K in Knox County, Missouri. The project length is 0.245 miles. Bids must be submitted electronically via Bid Express by 11:00 AM local time on December 18, 2026. A bid bond of 5% or more of the bid amount is required. Prevailing wage rates apply. The project involves bridge construction, roadway items, and dynamic pile testing. Specific environmental and work zone traffic management provisions are included. Contractors must be prequalified. All questions concerning bid document preparation should be directed to the Central Office - Design Division at (573) 751-2876.

On PublicBidSearch: the original bid posting, 7 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 18, 2026, 11:00 AM CT
Time stated in bid documents
Dec 18, 2026, 11:00 AM Central Time
Bid bond
5%
Submission
electronic portal
Documents analyzed
7 published · 5 analyzed

Scope of work

  • Includes roadway items: clearing, excavation, aggregate base, pavement marking, pipe installation, seeding.
  • Includes bridge items: excavation, approach slabs, drilled shafts, steel piles, concrete, reinforcing steel.

Steps to Bid

  1. 1

    Submit completed Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening.

    See Secs 101-103 of the Missouri Standard Specifications for Highway Construction, and Rule 7 CSR 10-15.010, "Prequalification to Bid of Certain Contractors". Questionnaire and Contact information are provided on MoDOT's website.

  2. 2

    Submit bids electronically using "Bid Express Secure Internet Bidding" at Official linkPro. by Dec 18, 2026, 11:00 AM

    Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction.

  3. 3

    Submit a Bid Guaranty meeting the requirements of Sec 102 of the Missouri Standard Specifications for Highway Construction.

    If submitting a project specific or annual bid bond, bidders must use the MoDOT provided bid bond forms. The project specific bond form is included in the request for bid. The project specific and annual bid bond forms are also available on MoDOT's website. Annual bid bonds shall be executed by June 15th of each year.

What you'll need

Bid security

Required

Bid bonds must be submitted on a form furnished by the Commission, executed by the bidder and corporate surety, and naming the "State of Missouri, acting by and through the Missouri Highways and Transportation Commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid.

Prequalification

Required

Award method

The right is reserved by the Missouri Highways and Transportation Commission to reject any or all bids.

Submission

Electronic portal

How to submit

All bids shall be submitted electronically using "Bid Express Secure Internet Bidding" at Official linkPro. Any paper bid submitted will be considered irregular per section 102.8 of the Missouri Standard Specifications for Highway Construction.

In person/mail: Missouri Highways and Transportation Commission, Attention: State Design Engineer/Bid Bond, P.O. Box 270, Jefferson City, MO 65102

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 8 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Job JNE0156: Route K, Knox County. Bridge replacement over Middle Fabius River, 0.5 mile east of Route V near Colony. The total length of improvement is 0.245 miles. This project is part of MoDOT's December 18, 2026 letting, Contract ID: 261218-B04 (Call B04). It also includes bridge items such as excavation, removal of bridges, bridge approach slabs, drilled shafts, rock sockets, structural steel piles, concrete, and reinforcing steel. A Water Pollution Control Manager (WPCM) is required for projects with land disturbance of one acre or more. Specific tree clearing restrictions are in place for protected bat species, requiring tree removal between October 16 and March 31. Commission-owned signs removed from the project shall be disassembled, stored, transported, and delivered to a recycling center for destruction. Liquidated damages apply for failure to complete the work on time, with daily charges for road user costs and contract administrative costs.

Key dates

Bids due
Dec 18, 2026, 11:00 AM CT

Documents

  • 261218_B04_JNE0156_BID_BOOK.pdf15 pages
  • 261218_B04_JNE0156_JSP_Roadway.pdf36 pages
  • 261218_B04_JNE0156_Bridge_JSP.pdf8 pages
  • 261218_B04_JNE0156_PLANS.pdf49 pages
  • 261218_B04_JNE0156_X_SECTIONS.pdf10 pages
  • 261120_Notice_To_Contractors_B04_H02_H07.pdf4 pages
  • 261218_Notice_To_Contractors.pdf8 pages

See all documents · Download with Pro

More from this agency

Similar bids in Missouri

Closing soon in Missouri