OpenConstructionCloses Dec 18, 2026, 11:00 AM CT

Bridge Replacement Over Drainage Ditch No. 52 North of Portageville

Missouri Department of Transportation — MoDOTMissouri#261218-H06

This project involves the replacement of a bridge over Drainage Ditch No. 52 on Route ZZ in New Madrid County, Missouri. The scope of work includes earthwork, paving, drainage structures (culverts and flap gates), signage, and the construction of a new concrete box culvert. Bids must be submitted electronically via Bid Express. Prevailing wage rates are applicable. The project is federally funded, and bidders must comply with federal regulations.

On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 18, 2026, 11:00 AM CT
Bid bond
Required
Submission
electronic portal
Documents analyzed
5 published · 4 analyzed

Scope of work

  • Perform earthwork, excavation, and grading
  • Install pipe culverts and flap gates
  • Apply pavement markings and aggregate base

Steps to Bid

  1. 1

    Submit bids electronically using "Bid Express Secure Internet Bidding" at Official linkPro.

  2. 2

    Submit the Subcontractor Disclosure Form in accordance with the bidding documents.

What you'll need

Submission

Electronic portal

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Job JSE0107: Route ZZ, New Madrid County. Bridge replacement over Drainage Ditch No. 52 north of Portageville, with a total length of improvement being 0.125 miles. The work includes removal of improvements, excavation, aggregate base, pavement, rock ditch liner, flap gates, construction signs, mobilization, pavement marking, pipe culverts, seeding, mulching, sediment removal, temporary seeding, signing, and bridge construction (removal of existing bridge, dewatering, concrete box culvert construction with reinforcing steel).

Key dates

Bids due
Dec 18, 2026, 11:00 AM CT

Documents

  • 261218_H06_JSE0107_Bid_Book.pdf14 pages
  • 261218_H06_JSE0107_JSP_Roadway.pdf35 pages
  • 261218_H06_JSE0107_JSP_Bridge.pdf3 pages
  • 261218_H06_JSE0107_Plans_S.pdf13 pages
  • 261218_Notice_To_Contractors.pdf8 pages

See all documents · Download with Pro

More from this agency

Similar bids in Missouri

Closing soon in Missouri