Roadway widening and other improvements on US 24 from MP 317.8 – 321.3 — El Paso County
Colorado DOT — Region 2El Paso, Colorado#NHPP 0243-094 (25094)
Colorado Department of Transportation (CDOT) is soliciting bids for roadway widening and other improvements on US 24 from milepost 317.8 to 321.3 in El Paso County, Region 2. The project includes widening US 24 to four lanes and extending box culverts and bridges. The bid submission deadline is December 10, 2026, at 11:59 PM MT. The project is estimated to cost over $20 million.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 11, 2026
- Time stated in bid documents
- Dec 10, 2026, 11:59 PM Mountain Time
- Submission
- mail, hand delivery
- Contract term
- 3 years + two additional one-year renewal terms
- Documents analyzed
- 3
Scope of work
- Improve drainage and stormwater management
- Install new traffic signals and signage
- Resurface and strip the roadway
Steps to Bid
- 1
Register with CDOT as a pre-qualified bidder
- 2
Submit a bid proposal by the due date and time by Dec 10, 2026, 11:59 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
237131, 237132, 237133
How to submit
Bids must be submitted in a sealed envelope. The envelope must be marked with the project number and bid number. Bids must be received by the due date and time. Late bids will not be accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Please contact Patti Henschen at 719-621-8352 for all project related questions. Meeting can be accessed via Google Meet joining info Video call link: Google Meet joining info: [link available with Pro] Or dial: +1 424-282-9759 PIN: 470 934 425 #
Key dates
- Pre-bid meeting
- Nov 19, 2026, 2:00 PM Mountain Time
- Bids due
- Dec 11, 2026
Documents
- CY_2026_Anticipated_Project_Advertisements.pdf6 pages
- GO_Sheet.pdf4 pages
- CDOTPlanHolders.pdf16 pages
More from this agency
- Resurfacing, Rumble Strips, and Bridge Deck Repairs on SH 135 from MP 14.1 to MP 23.8, Gunnison County, Colorado · closes Dec 11, 2026
- Surface Treatment (1 In. Leveling Course with 1.5 In. Overlay) on CO 12 (MP 26.1–70.4), Las Animas County · closes Dec 18, 2026
- Hot mix asphalt roadway resurfacing on SH 22 from MP 0 to MP 2.5 — Adams County · closes Dec 18, 2026
- Mill and Overlay SH8 from Old Kipling (MP 7.11) to Wadsworth (MP 8.65) · closes Dec 18, 2026
- Safety & Multimodal Improvements - Medians, Crossings, Bike/Ped - Sheridan SH95 17th to 26th · closes Dec 18, 2026
Similar bids in Colorado
- FY27 / DQ - Building 106 West Recreation Yard · closes Dec 11, 2026
- Resurfacing State Highway 79 from Milepost 1.6 to Milepost 4.1, Adams County, Colorado · closes Dec 4, 2026
- 2026 South Branch Library ‘Refresh’ Project
- Building Decarbonization Enterprise Fund Education and Resource Development · closes Jan 5, 2027
- Expansion Construction Project — Invitation to Bid · closes Dec 10, 2026
Closing soon in Colorado
- Colorado Water Reuse Progress Report and Roadmap · closes Nov 30, 2026
- CAVEA Lighting Upgrade and Installation at MSU Denver · closes Nov 30, 2026
- Request for Bids: Miscellaneous Concrete Contract Work for 2027 Calendar Year · closes Dec 1, 2026
- Sun Net iTOA Software Maintenance Support Renewal – Annual Contract · closes Dec 2, 2026
- Mill/Overlay, ADA Updates, Bridge Work on WB US6 to WB I70 - Jefferson County, CO · closes Dec 4, 2026