Roadway Improvements (Widening, Resurfacing, Turn Lane Installation, Crossover Removal, and Traffic Stripe) on SR-210 (US-231/Ross Clark Circle) in Houston County, Alabama
Alabama Department of TransportationDothan, Alabama#NH-0210
Scope includes widening, resurfacing, turn lane installation, crossover removal, traffic striping, concrete island removal, and traffic signal modifications. A $5.00 proposal and $41.00 per set of plans are available for purchase. A bid bond of 5% of the bid amount (up to $50,000) is required. The project is subject to federal prevailing wage requirements and the Contract Work Hours and Safety Standards Act.
On PublicBidSearch: the newspaper notice for this bid.
Overview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Submission
- mail, hand delivery
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Widen SR-210 from Fortner Street to SR-52
- Resurface 0.838 miles of roadway
- Install turn lanes and remove crossovers
- Apply traffic striping and signage
- Remove concrete islands at intersections
- Modify traffic signals at SR-52 and Fortner Street
Steps to Bid
- 1
Prepare and complete the bid submission, including a bid bond of 5% of the bid amount (maximum $50,000.00) or a cashier’s check.
What you'll need
Insurance
RequiredThis project is subject to the Contract Work Hours and Safety Standards Act and its implementing regulations.
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Construction of roadway improvements on SR-210 (US-231/Ross Clark Circle) in Houston County, Alabama, including widening, resurfacing, turn lane installation, crossover removal, and traffic stripe application. Work extends from 0.100 mile west of the junction of Fortner Street to the junction of SR-52, including concrete island removal and traffic signal modifications at SR-52 and Fortner Street. A bidding proposal may be purchased for $5.00. Plans and proposals will be mailed only upon receipt of remittance. No refunds will be issued. Minimum wage rates are pre-determined by the Secretary of Labor and specified in the advertised specifications. A bid bond of 5% of the bid amount (maximum $50,000.00) or a cashier’s check must accompany each bid as evidence of good faith. The bracket range is provided for informational purposes only and should not be used in bid preparation or award decisions.
Key dates
- Bids due
- Dec 4, 2026, 10:00 AM CT
More from this agency
- Sealed Bids for Construction Work — State Project No. ATRP2-16-2026-195, Coffee County, Alabama · closes Dec 4, 2026
- Intersection Improvements on SR-69 from Mimosa Park Road to I-20/I-59 Overpass, Tuscaloosa County, Alabama · closes Dec 4, 2026
- Safety Widening, Planing, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, Guardrail Installation, and Traffic… · closes Dec 4, 2026
- Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, Traffic Signal Upgrades, and Traffic Stripe on SR… · closes Dec 4, 2026
- Micro-Milling, Resurfacing, Guardrail Installation (Steel Blockout Replacement), and Traffic Stripe on SR-59 from CR… · closes Dec 4, 2026
Similar bids near Dothan
- Dothan All-Wheel Park · Dothan · closes Dec 17, 2026
- Lolley Gym Renovation at Enterprise State Community College · Enterprise · closes Dec 10, 2026
- Elba Terminal Building at Carl Folsom Airport · Elba · closes Dec 4, 2026
- Elba Site Development for Parking Lot and Terminal Building · Elba · closes Dec 4, 2026
- CDBG Urgent Need for Street Improvements — Project Nos. LR-SF-PF-19-113 and LR-SF-PF-20-113 · Geneva · closes Dec 3, 2026
Closing soon near Dothan
- Fresh Bread Service for Dothan City Schools Child Nutrition Program · Dothan · closes Dec 1, 2026
- Fresh Bread Service · Dothan · closes Dec 1, 2026
- Residential Solid Waste Collection Services · Ashford · closes Dec 2, 2026
- Water Main Replacement, Phase IV · Enterprise · closes Dec 3, 2026