IIGC Downtown Water and Sewer Improvements Phase II
City of Fresno — Capital Projects DepartmentFresno, California#12700982
The City of Fresno is soliciting bids for the IIGC Downtown Water and Sewer Improvements Phase II project. The work involves installing 12-inch, 16-inch, and 24-inch ductile iron water mains, and 10-inch and 12-inch sewer mains in the downtown area. Alternate work may include additional water mains, fire hydrants, water service transfers, and Cured-in-Place sewer main rehabilitation. A pre-bid conference is scheduled for December 3, 2026, at 10:00 AM. Contractors must hold a valid Class "A" or both Class "C34" and Class "C36" Contractor's License. A 10% bid deposit is required. Payment and Performance Bonds of 100% are required after award.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 15, 2026
- Time stated in bid documents
- Dec 15, 2026, 3:00 PM Pacific Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Documents analyzed
- 4 published · 3 analyzed
Scope of work
- 30", 36" Cured-in-Place sewer main rehabilitation
- 10" Cured-in-Place pipe liner with Vinyl Ester Resin
Steps to Bid
- 1
Submit bids electronically via Planet Bids. by Dec 15, 2026, 3:00 PM
Bid Proposals must be filed electronically prior to the bid opening at 3:00 PM on Tuesday, December 15, 2026.
- 2
Attend the pre-bid conference. by Dec 3, 2026, 10:00 AM
A pre-bid conference will be held at 10:00 AM, on Thursday, December 3, 2026.
- 3
Submit Subcontractor Information – Detail. by Dec 16, 2026
If bidder lists subcontractors on page 1.15, this form is to be submitted to the Purchasing Division within one working day from the date of the bid opening.
What you'll need
Bid security
RequiredA 100 percent Payment Bond and 100 percent Performance Bond for all public works contracts must be filed with the Contract Documents and approved by the City before the Contractor enters upon performance of the Work.
Prequalification
RequiredContract duration
ONE HUNDRED TWENTY (120) working days from the date of the Notice to Proceed. If any or all of Additive Alternates 1, 2, and/or 3 are awarded, an additional THIRTY (30) working days will be added to the total contract working day allotment for a total of ONE HUNDRED FIFTY (150) working days.
Submission
Electronic portal
NAICS
11111, 34000, 65800, 65900, 89000, 90638, 90694, 90900, 90922, 91024
How to submit
Bids will be submitted electronically via Planet Bids. Bid Proposals must be filed electronically prior to the bid opening at 3:00 PM on Tuesday, December 15, 2026 when the bids will be publicly opened and recorded. Electronically filed is defined as by means of electronic equipment or devices.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope of work includes but is not limited to: Installation of 12-inch, 16-inch and 24-inch ductile iron water mains and installation of 10-inch and 12-inch sewer mains within the Downtown area bounded by State Routes 41, 180 and 99.
Key dates
- Pre-bid meeting
- Dec 3, 2026, 10:00 AM Pacific Time
- Bids due
- Dec 15, 2026
Documents
- 20261118114345174_12700982_NIB.pdf3 pages
- 20261118114346633_12700982_IIGC_Downtown_Water_Sewer_Imp_PH_II_Specification.pdf387 pages
- 20261118114349196_12700982_Plans.pdf
- 20261118114350647_Statement_of_Qualifications.pdf4 pages
More from this agency
- River West Fresno Eaton Trail Extension Phase 1 — closes Nov 20, 2026
- Request for Information (RFI) on Modern Transit Management Software for Fresno Area Express (FAX) — closes Nov 20, 2026
- Mailbox Only - RFP for Contractor Services for Public Spay and Neuter Facilitation — closes Nov 30, 2026
- Product Purchase Contract for 2026 or Newer Chevrolet Silverado EV, Extended Range, Work Truck — closes Dec 1, 2026
- Product Purchase Contract for 2026 or Newer Dodge Durango & Ram ProMaster City — closes Dec 1, 2026
Similar open bids
- City of Corona Utilities Department Plumbing Services — City of Corona
- North Orinda Sewer Renovations, Phase 9 — Central Contra Costa Sanitary District
- Moorpark College Student Service Annex Sewer Line Reroute — Ventura County Community College District
- On-Call Fuel Station Testing, Maintenance, and Repairs — City of Bakersfield
- HD-S3262 On-Call Services for Underground Wet Utilities — Port of Long Beach
Closing this week nearby
- 2027 Annual Pavement Rehabilitation Project – Professional Design Services RFP — closes Nov 20, 2026
- RFP – Country Club Drive Pavement Rehabilitation and Active Transportation Design Services — closes Nov 20, 2026
- 2026 Affordable Housing Notice of Funding Availability — closes Nov 20, 2026
- On-Call Armed Security Guard Services for the City of Santa Rosa Police Department — closes Nov 20, 2026
- Construction Manager at Risk for BMR Building at Middlefield Development — closes Nov 20, 2026