OpenIFBCloses Dec 9, 2026

North Orinda Sewer Renovations, Phase 9

Central Contra Costa Sanitary District — EngineeringMartinez, Contra Costa, California#DP 100052

The work generally consists of the renovation of approximately 11,000 LF of existing sewer pipelines by open cut, pipe bursting, and horizontal directional drilling methods.

On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 9, 2026
Time stated in bid documents
Dec 9, 2026, 2:00 PM Pacific Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Documents analyzed
6 published · 5 analyzed

Scope of work

  • Install new standard 48-inch diameter manholes (concrete and polyethylene)
  • Reconnect existing laterals and extend laterals
  • Perform aerial crossings over creeks and drainage ditches
  • Restore and pave affected areas

Steps to Bid

  1. 1

    Obtain Project Documents from the District website or PlanetBids.

  2. 2

    Attend the pre-bid meeting to discuss the Project.

  3. 3

    Submit questions via PlanetBids online Q&A.

  4. 4

    Prepare and submit bid on the forms furnished within the Project Manual.

  5. 5

    Ensure bid is received by the District by the stipulated time and date.

What you'll need

Contract duration

300 Calendar Days

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project involves the renovation of approximately 11,000 linear feet (LF) of existing sewer pipelines. The scope includes the installation of new standard 48-inch diameter main manholes (33 concrete, 19 polyethylene), modification of existing manholes (7), installation of 8 and 10-inch PVC or HDPE pipe using open-cut (1628 LF), pipe burst (7729 LF), and horizontal directional drilling (312 LF) methods. It also includes the installation of 6, 8, and 10-inch HDPE pipe using the pipe burst method (7729 LF) and 10-inch HDPE pipe using horizontal directional drilling (312 LF). Additionally, 500 LF of HDPE, PVC, and VC pipe will be installed using the direct bury method or for pipeline sag repairs. The project requires locating and verifying active and inactive house or building laterals (107), reconnecting active laterals (96), and extending existing 4" & 6" sewer laterals (80 LF). Other items include the provision and installation of Overflow Protection Devices (OPDs) and cleanouts (5), aerial crossings over creeks (80' and 50'), an aerial crossing over a drainage ditch (70'), removal of trees greater than 9" in diameter (15), provision and installation of miscellaneous AC pavement (100 TN), open-cut hard rock/foundation/concrete encasements (100 CY), overexcavation of sewer trench bottom/manhole base (100 CY), and additional utility potholing (100 HR). The work is located in Orinda, California, within easements and streets. Central Contra Costa Sanitary District (Central San) is the awarding agency. The estimated cost of construction is $5,800,000.

Key dates

Pre-bid meeting
Nov 18, 2026, 11:00 AM Pacific Time
Bids due
Dec 9, 2026

Documents

  • 20261110153452754_NTC_100052.pdf2 pages
  • 20261110173230977_DP_100052_Vol._1.pdf36 pages
  • 20261110173805886_DP_100052_Vol._2A.pdf390 pages
  • 20261110173807212_DP_100052_Vol._2B.pdf159 pages
  • 20261110173820815_DP_100052_Vol._2C.pdf
  • 20261110173353418_100052_-_Vol_3.pdf40 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby