Replacement of Hickory Street Road Bridge Over Fourmile Brook

Town of Suffield, CTSuffield, Connecticut

The project involves replacing the existing concrete culvert with a new prestressed concrete three-sided frame, including headwalls, roadway reconstruction, metal beam rail installation, regrading, and turf restoration. The contract is subject to state contract compliance and set-aside requirements.

On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 3, 2026
Time stated in bid documents
Dec 3, 2026, 2:00 PM Eastern Time
Submission
mail, hand delivery
Documents analyzed
5 published · 2 analyzed

Scope of work

  • Complete replacement of existing 10-foot single span cast-in-place reinforced concrete slab structure culvert.
  • Installation of cast-in-place concrete headwalls and roadway reconstruction.
  • Furnishing, installing, and incorporating all materials and equipment.

Steps to Bid

  1. 1

    Attend pre-bid meeting. was Nov 17, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

    At the site.

What you'll need

Contract duration

one hundred thirty (130) consecutive calendar days of issuance of Notice to Proceed

Award method

The Town will compare individual base bids and discounted combinations and award the projects in the combination that provides the lowest total price from qualified, responsible bidders.

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The work also includes the installation of cast-in-place concrete headwalls, roadway reconstruction, placement of metal beam rail, associated regrading and turf restoration and other miscellaneous site work. The work described above includes furnishing, installing and incorporating all materials and equipment into the project as well as performing or providing all labor, supervision, equipment and services unless otherwise noted within the bid documents for the lump sum base bid. This project is being bid together with the Copper Hill Bridge and Suffield Street Bridge projects. Bidders may bid on one, two, or all three projects as described in Section 16. The work generally consists of the complete replacement of the existing concrete bridge with new precast concrete 3-sided frame founded on H-piles. The work also includes the installation of pre-cast concrete headwalls, wingwalls, roadway reconstruction, placement of metal beam rail, associated regrading and turf restoration and other miscellaneous site work as shown on the plans or directed by the Owner. See CHRO Requirements in Contract Documents.

Key dates

Pre-bid meeting
Nov 17, 2026, 10:00 AM Eastern Time
Bids due
Dec 3, 2026

Documents

  • 20261105_Bid_document_HickoryStreet_Optimized1.pdf218 pages
  • 20261105HickoryStreetFinalDesignPlans1.pdf
  • 20261105_HickoryStreet_Highway_Standards1.pdf9 pages
  • HickoryStreet_Addendum_No_1_Accessible.pdf1 pages
  • 20261125HickoryStBridgeAddendum2.pdf13 pages

See all documents · Download with Pro

More from this agency

Similar bids in Connecticut

Closing soon in Connecticut