Twin Rivers Unified School District: E-Rate FY2027 Category 2 - Wireless Access Points, UPS Equipment, Switches, and Cabling Infrastructure
Twin Rivers Unified School DistrictNorth Highlands, California#270002680
Twin Rivers Unified School District is soliciting proposals for E-Rate FY2027 Category 2 equipment and services, including Wireless Access Points, UPS/Battery Backup, Switches, and Cabling Infrastructure. The bid submission deadline is December 11, 2026, at 10:00 a.m., with electronic submission required through the SecureBids portal. A mandatory site walk for the cabling infrastructure project is scheduled for November 4, 2026. The total quantities for wireless access points are 135 units, UPS units are 17, and switches are 22. The cabling project involves extensive installation of CAT6A and fiber optic cables across multiple school sites. All proposals must comply with federal, state, and local procurement requirements, including CA PCC 20111.8.
Overview
- Due
- Nov 26, 2026
- Bid bond
- Required
- Submission
- electronic portal
- Documents analyzed
- 9
Scope of work
- Procurement of Wireless Access Points (135 units) and associated software/licenses.
- Procurement of UPS/Battery Backup equipment (17 units) and associated software/licenses.
- Procurement of Network Switches (22 units) and associated software/licenses.
- Installation of approximately 219,100 feet of CAT6A cabling and 6,550 feet of fiber cabling.
- Demolition and removal of existing Category 5e and multimode fiber cabling.
- Installation of new pathways, cabinets, patch panels, and terminations for network infrastructure.
Steps to Bid
- 1
Review RFP documents for Wireless Equipment, UPS Equipment, Switches, and Cabling Infrastructure.
- 2
Attend mandatory site walk for Cabling Infrastructure project. was Nov 4, 2026, 11:00 AM
This date has passed — confirm eligibility with the agency before bidding.
Meet at Grant High School Main Office, 1400 Grand Avenue, Sacramento, 95838. The walk-through will proceed to Rio Linda High School Stadium and conclude at Highlands High School.
- 3
Submit questions regarding the RFPs. by Nov 10, 2026, 10:00 AM
Via email to [email available with Pro] with the subject line 'RFP [RFP Number] questions'.
- 4
Check SecureBids portal for question responses and addenda. by Nov 13, 2026
Responses to questions and any addenda will be posted on [link available with Pro] or [link available with Pro].
- 5
Submit proposals electronically through the District's online bidding portal, SecureBids.
Hard copies will not be accepted. The bid opening will occur virtually on the same day at 10:05 a.m.
What you'll need
Bid security
RequiredThe bidding contractor must provide bonds: The bid bond with the RFP response package. Payment and performance bonds 1 week prior to the commencement of the project.
Contract duration
Completion by September 30, 2028 (for Cabling Infrastructure)
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
This solicitation encompasses multiple procurements for Twin Rivers Unified School District related to E-Rate FY2027 Category 2 funding. The procurements include: Manufacturer: Ruckus Wireless or equivalent. 2. **Uninterruptable Power Supply/Battery Backup and Necessary Software and Licenses:** 17 units, with basic maintenance for 17 units. Manufacturer: American Power Conversion. 3. **Switches and Necessary Software and Licenses:** 22 units, with basic maintenance for 22 units. Manufacturer: Aruba or equivalent. A mandatory site walk for the cabling infrastructure project is scheduled for Wednesday, November 4, 2026, at 11:00 a.m., starting at Grant High School Main Office. All RFPs are due electronically via the District's online bidding portal, SecureBids, by December 11, 2026, at 10:00 a.m. The bid opening will occur virtually on the same day at 10:05 a.m. State or local procurement rules: CA PCC 20111.8.
Key dates
- Questions due
- Nov 10, 2026, 10:00 AM Pacific Time
- Pre-bid meeting
- Nov 4, 2026, 11:00 AM Pacific Time · Mandatory
- Site visit
- Nov 4, 2026, 11:00 AM Pacific Time
- Bids due
- Nov 26, 2026
Documents
- 22835569-USAC_FCC_FORM_470_APPLICATION_270002680_CERTIFIED.pdf5 pages
- 22833821-Twin_Rivers_YR_30_RFP_27_014_Wireless_Equipment_Exhibit_D_Cost_Pro.xlsx
- 22833817-Twin_Rivers_YR_30_RFP_27_014_Wireless_Equipment.pdf38 pages
- 22833823-Twin_Rivers_YR_30_RFP_27_015_UPS_Equipment_Exhibit_D_Cost_Proposal.xlsx
- 22833822-Twin_Rivers_YR_30_RFP_27_015_UPS_Equipment.pdf28 pages
- 22833825-Twin_Rivers_YR_30_RFP_27_016_Switch_Equipment_Exhibit_D_Cost_Propo.xlsx
- 22833824-Twin_Rivers_YR_30_RFP_27_016_Switch_Equipment.pdf25 pages
- 22835174-Twin_Rivers_YR_30_RFP_27_017_Cabling_Infrastructure.pdf54 pages
1 more file
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- Districtwide Landscape Bark & Playground Engineered Wood Fiber Replenishment Services — closes Nov 13, 2026
- Grant Union High School Auditorium Sound System Design Project — closes Nov 16, 2026
- Northlake TK-8 School Concrete Walkway Replacement Project — closes Nov 17, 2026
- Dry Creek Elementary School Transitional Kindergarten Expansion and Site Improvements Project — closes Nov 19, 2026
- RFP for Cabling Infrastructure - Erate YR 2027 (YR30) — closes Dec 11, 2026
Similar open bids
- Workforce Development Board (WDB) Meeting Notification System — Community Investment Department
- The San Francisco School: E-Rate FY2027 Category 2 - Wireless Access Points and Necessary Software and Licenses;… — The San Francisco School
- Springshare Patron Point Renewal - Brand Specific — Los Angeles County - Internal Services Department
- Broad Agency Announcement (BAA) for Naval Warfare and Weapons at NAWCWD, China Lake, CA — DEPT OF THE NAVY
- Hosted Voice over Internet Protocol (VoIP) Phone Service Provider — Merced County Association of Governments
Closing this week nearby
- Special Events Coordinator — closes Nov 9, 2026
- Third Party Collection Services Extension — closes Nov 9, 2026
- Ice Machine Maintenance & Repair and Freon Extraction — closes Nov 9, 2026
- Meadows Parkway Pavement Rehabilitation — closes Nov 9, 2026
- Meadows Parkway Pavement Rehabilitation Project No. PW25-07 — closes Nov 9, 2026