Dry Creek Elementary School Transitional Kindergarten Expansion and Site Improvements Project
Twin Rivers Unified School District — Facilities Construction & PlanningMcClellan Park, California#27-003
27-003). The project involves lease-leaseback agreement for construction services. A mandatory pre-proposal meeting and site walk will be held on November 3, 2026, at 9:00 a.m. at Dry Creek Elementary School. Questions are due by November 10, 2026, at 2:00 p.m.
Overview
- Due
- Nov 19, 2026
- Time stated in bid documents
- Nov 19, 2026, 9:00 AM Pacific Time
- Bid bond
- Required
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- email, mail
- Contract term
- twelve (12) months after the Project is finally Complete
- Documents analyzed
- 6 published · 4 analyzed
Scope of work
- Comprehensive site improvements including parking lot and hardcourt replacement, new bus drop-off area, asphalt paving, concrete flatwork, fencing, landscaping,
- Modernization of existing TK/K building, including restrooms, administrative offices, and ancillary spaces.
- Upgrades to interior finishes, lighting, fire alarm, low-voltage systems, roofing, and HVAC systems.
- Potential incorporation of flexible-use spaces for evolving instructional needs.
- Coordination of site grading, drainage, circulation, accessibility, and utility infrastructure.
- Preconstruction services including budget and schedule development, constructability reviews, value engineering, and assistance with permits and approvals.
Steps to Bid
- 1
Attend mandatory pre-proposal meeting and site walk. was Nov 3, 2026, 9:00 AM
This date has passed — confirm eligibility with the agency before bidding.
Dry Creek Elementary School, 1230 G St., Rio Linda, California 95673.
- 2
Submit questions regarding the RFQ-P. by Nov 10, 2026, 2:00 PM
Via email to Victoria Garcia ([email available with Pro]), Rami Wahhab ([email available with Pro]), Wayne Sjolund ([email available with Pro]), Josh Vaughan ([email available with Pro]), Carlo Pane ([email available with Pro]), and Anthony Tassano ([email available with Pro]).
- 3
Achieve prequalified status through Quality Bidders. by Nov 13, 2026, 2:00 PM
[link available with Pro]
What you'll need
Bid security
RequiredContractor shall provide the bonds set forth in Exhibit C, including performance and payment bonds.
Prequalification
RequiredContract duration
June 7th, 2027, and complete the Project on or before August 13th, 2027
Submission
Email, Mail
How to submit
One (1) electronic copy and five (5) hard copies.
In person/mail: Twin Rivers Unified School District, Attn: Brittany Smith, Director Contracts & Risk Management, 3222 Winona Way, Suite 201, North Highlands, California 95660
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
on November 19, 2026, statements of qualifications and sealed proposals for the following District Project(s): RFQ-P No. 27-003 Dry Creek Elementary School Transitional Kindergarten Expansion and Site Improvements Project. The Request for Qualifications and Proposals (“RFQ-P”), including all currently available plans, specifications, and related documents, may be obtained from the District’s website at the following link: [link available with Pro] or requested via email by contacting Brittany Smith, Director of Contract Services & Risk Management, at [email available with Pro]. A mandatory pre-proposal meeting and site walk will be held at Dry Creek Elementary School, located at 1230 G St., Rio Linda, California 95673, on November 3, 2026 at 9:00 a.m. This mandatory meeting and site walk is for all Proposers intending to submit a proposal for the Project. Proposers who do not attend the mandatory meeting and site walk will not be permitted to submit an RFQ-P for this Project. The District reserves the right to reject any or all proposals, to accept or reject any one or more items of a proposal, or to waive any irregularities or informalities in the proposals. The District also reserves the right to select one Proposer, multiple Proposers, or no Proposers.
Key dates
- Questions due
- Nov 10, 2026, 2:00 PM Pacific Time
- Pre-bid meeting
- Nov 3, 2026, 9:00 AM Pacific Time · Mandatory
- Site visit
- Nov 3, 2026, 9:00 AM Pacific Time
- Bids due
- Nov 19, 2026
Documents
- 26_10_28_Dry_Creek_ES_Civil_Concept_Package.pdf
- TRUSD_Lease-Leaseback_Agreement_Example.pdf130 pages
- TRUSD_Lease-Leaseback_Site_Lease_Example.pdf10 pages
- TRUSD_Lease-Leaseback_Facilities_Lease_Example.pdf14 pages
- RFQ-P_No._27-003_Dry_Creek_Elementary_School_TK_Expansion_and_Site_Improveme.pdf24 pages
- RFQ-P_No._27-003_-_Dry_Creek_ES_Addendum_1.pdf4 pages
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- Districtwide Landscape Bark & Playground Engineered Wood Fiber Replenishment Services — closes Nov 13, 2026
- Grant Union High School Auditorium Sound System Design Project — closes Nov 16, 2026
- Northlake TK-8 School Concrete Walkway Replacement Project — closes Nov 17, 2026
- Twin Rivers Unified School District: E-Rate FY2027 Category 2 - Wireless Access Points, UPS Equipment, Switches, and… — closes Nov 26, 2026
- RFP for Cabling Infrastructure - Erate YR 2027 (YR30) — closes Dec 11, 2026
Similar open bids
- Harbor Fleet Zero Emissions Infrastructure — Port of Long Beach
- FORD F-350 XL OR EQUAL REGULAR CAB & CHASSIS, 4X2 DUAL REAR WHEEL W/ 9’ UTILITY BODY, LIFTGATE, & LUMBER RACK — City of Glendale
- Uniform Rental and Laundry Services — San Luis Obispo Regional Transit Authority
- Off-Site Ski Pass, Lodging, and Ski Area Access for Marine Corps Mountain Warfare Training Center — DEPT OF THE NAVY
- 2026 or Newer Ford F-350 XL Regular Cab 4x2 Dual Rear Wheel with Service Body and Liftgate — City of Glendale
Closing this week nearby
- Special Events Coordinator — closes Nov 9, 2026
- Haul-Out, Welding, and Launch Services for 47-Foot Motor Lifeboat (MLB) 47237 – Port Quarter Repair — closes Nov 9, 2026
- Third Party Collection Services Extension — closes Nov 9, 2026
- Ice Machine Maintenance & Repair and Freon Extraction — closes Nov 9, 2026
- Meadows Parkway Pavement Rehabilitation — closes Nov 9, 2026