Design-Build Services – STM Security Fencing - North Boundary
Department of Energy — ALLIANCE FOR ENERGY INNOVATION, LLC - DOE CONTRACTORGolden, Colorado#RFP-2027-27107
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design?build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain?link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design?Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued?for?Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design?to?cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off?site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on?site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as?built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 12, 2026
Get alerts for bids like this
New engineering bids in Colorado
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeDocuments
- 0_-_RFP-2027-27107_-_STM_Security_Fencing-_North_Boundary_-_LPTA.pdf9 pages
- SAM_Post_Narrative_-_STM_North_Boundary_Fencing.pdf3 pages
- AMENDMENT_NO._1_-_RFP-2027-27107.pdf1 pages
- RFP_-_Amendment_2_-_Drone_Video_Extension.pdf1 pages
- RFP_-_Amendment_3_-_Drone_Video_and_Safety_Requirements.pdf1 pages
More from this agency
- Sun Net iTOA Software Maintenance Support Renewal – Annual Contract · closes Dec 2, 2026
- SIMPLOT MINE LINE HARDWARE · closes Dec 14, 2026
- Material/Hardware & Wire/Cable for Archer-Cheyenne · closes Dec 14, 2026
- Pilot-Scale Direct-Fired Cement Kiln System · closes Jan 26, 2027
Similar bids near Golden
- 38th West Improvements · Wheat Ridge · closes Jan 5, 2027
- Fees & Services Cost Recovery Analysis – Request for Information (RFI) · Thornton · closes Dec 19, 2026
- R1 PS East 60th Avenue Multimodal Connections Planning and Environmental Linkages Study Services · Denver · closes Dec 3, 2026
- US36 Wildlife Crossings 30% Engineering Design Project · Boulder County · closes Dec 14, 2026
- Design-Build Services for South Boulder Rd Slip Lining Project · Louisville · closes Dec 18, 2026
Closing soon near Golden
- Grants Consultant for Public Health · Boulder · closes Nov 30, 2026
- As-Needed Emergency Board-Up, Temporary Fencing, and Site Security Services Per City Specifications · Lakewood · closes Dec 1, 2026
- Belleview Park Enhancements · Englewood · closes Dec 1, 2026
- West Dartmouth Avenue Multimodal Safety Improvements Project · Englewood · closes Dec 1, 2026
- RFP: Boettcher Concert Hall Renovation CM/GC · Denver · closes Dec 2, 2026