Purchase of Flat Bar Clamps, Tee Connectors, and Vertical Bus Support Clamps
Los Angeles Department of Water and Power — PWR DS SUBSTATIONSLos Angeles, California#146696
The Los Angeles Department of Water and Power (LADWP) is soliciting bids for 30 flat bar clamps, 40 tee connectors, and 10 vertical bus support clamps. Delivery must occur within 140 to 154 calendar days from order receipt, during business hours Monday to Friday. All items are subject to inspection and must include manufacturer and part number. Equivalent products are allowed with supporting documentation. Bids remain firm for 90 days. Bidders must provide a valid BTRC number, VRN, or exempt tax registration certificate if requested. Payment is due 30 days after delivery. Protests must be filed in writing within 4 days of solicitation notice or addendum, or within 4 days of intent-to-award notice, by 4:00 PM local time. No local business preference applies.
Overview
- Due
- Nov 10, 2026
- Time stated in bid documents
- Nov 10, 2026, 2:00 PM Pacific Time
- Submission
- electronic portal
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- 30 flat bar clamps, 4X4
- 40 tee connectors for 3'' flat bar with 1000KCMIL cable
- FOB destination at LADWP site
Steps to Bid
- 1
Ensure all bid items include manufacturer name and part number. If offering an equivalent product, attach literature and specifications. by Nov 10, 2026, 2:00 PM
- 2
Confirm that the bidder has a valid BTRC number, VRN, or exempt tax registration certificate, as applicable.
What you'll need
Submission
Electronic portal
NAICS
423840
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Procurement of 30 each NAICS 423840 BRZ Flat Bar Clamp 4X4 (AFL P/N: DH44), 40 each NAICS 423840 Tee Connector for 3'' Flat Bar with 1000KCMIL Cable (Dossert P/N: H2AF100-3), and 10 each NAICS 423840 Vertical Bus Support Clamp (Penn-Union P/N: AVB4T3/4). All items must include manufacturer name and part number in bid description. Bidders may offer equivalent products with supporting literature. Delivery hours: 7:30 AM to 2:30 PM, Monday through Friday, excluding recognized holidays. All materials subject to inspection; non-compliant or defective items will be returned at vendor expense. Bid acceptance valid for 90 days. Prices must remain firm for 90 calendar days from bid closing and include all duties and tariffs. No assignment of contract permitted without prior written consent. Payment terms: 30 calendar days after delivery and receipt of corrected invoice. Protest procedure requires written submission with specific elements, filed within 4 days of solicitation advertisement or addendum issuance, or within 4 days of intent-to-award notice.
Key dates
- Bids due
- Nov 10, 2026
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- Furnishing Filters, Filter Elements, Filter Assemblies, and Accessories — closes Nov 9, 2026
- Switching Stations Physical Security Upgrade Project — closes Nov 9, 2026
- RSLINX Classic Software for PI Interface – Perpetual License, Digital Delivery — closes Nov 10, 2026
- Chock Wheel, Regulator, Hose & Iron Pot — closes Nov 10, 2026
- Hydro Cranes 480 VAC Disc Switches and Main Breaker — closes Nov 10, 2026
Similar open bids
- Dry Creek Elementary School Transitional Kindergarten Expansion and Site Improvements Project — Twin Rivers Unified School District
- Harbor Fleet Zero Emissions Infrastructure — Port of Long Beach
- FORD F-350 XL OR EQUAL REGULAR CAB & CHASSIS, 4X2 DUAL REAR WHEEL W/ 9’ UTILITY BODY, LIFTGATE, & LUMBER RACK — City of Glendale
- Uniform Rental and Laundry Services — San Luis Obispo Regional Transit Authority
- Off-Site Ski Pass, Lodging, and Ski Area Access for Marine Corps Mountain Warfare Training Center — DEPT OF THE NAVY
Closing this week nearby
- Special Events Coordinator — closes Nov 9, 2026
- Third Party Collection Services Extension — closes Nov 9, 2026
- Ice Machine Maintenance & Repair and Freon Extraction — closes Nov 9, 2026
- Meadows Parkway Pavement Rehabilitation — closes Nov 9, 2026
- Meadows Parkway Pavement Rehabilitation Project No. PW25-07 — closes Nov 9, 2026